arXiv · 0705.0108
Reconstructing weak values without weak measurements
Abstract
I propose a scheme for reconstructing the weak value of an observable without the need for weak measurements. The post-selection in weak measurements is replaced by an initial projector measurement. The observable can be measured using any form of interaction, including projective measurements. The reconstruction is effected by measuring the change in the expectation value of the observable due to the projector measurement. The weak value may take nonclassical values if the projector measurement disturbs the expectation value of the observable.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Lars M. Johansen. 2007-05-01. Reconstructing weak values without weak measurements. https://doi.org/10.1016/j.physleta.2007.02.039
Cite the original work for its findings. Save a collection to share your selection of sources.