SearcharxivSearch

arXiv · 1212.2778

Feasibility Tests for Recurrent Real-Time Tasks in the Sporadic DAG Model

Abstract

A model has been proposed in [Baruah et al., in Proceedings of the IEEE Real-Time Systems Symposium 2012] for representing recurrent precedence-constrained tasks to be executed on multiprocessor platforms, where each recurrent task is modeled by a directed acyclic graph (DAG), a period, and a relative deadline. Each vertex of the DAG represents a sequential job, while the edges of the DAG represent precedence constraints between these jobs. All the jobs of the DAG are released simultaneously and have to be completed within some specified relative deadline. The task may release jobs in this manner an unbounded number of times, with successive releases occurring at least the specified period apart. The feasibility problem is to determine whether such a recurrent task can be scheduled to always meet all deadlines on a specified number of dedicated processors. The case of a single task has been considered in [Baruah et al., 2012]. The main contribution of this paper is to consider the case of multiple tasks. We show that EDF has a speedup bound of 2-1/m, where m is the number of processors. Moreover, we present polynomial and pseudopolynomial schedulability tests, of differing effectiveness, for determining whether a set of sporadic DAG tasks can be scheduled by EDF to meet all deadlines on a specified number of processors.

Explore related subjects

Keep this discovery

BibTeXRIS

Vincenzo Bonifaci, Alberto Marchetti-Spaccamela, Sebastian Stiller, Andreas Wiese. 2012-12-12. Feasibility Tests for Recurrent Real-Time Tasks in the Sporadic DAG Model. https://doi.org/10.1109/ecrts.2013.32

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Quasi-Monte Carlo Beyond Hardy-Krause II: $(1 + \varepsilon)n$ Samples Suffice

Numerical integration studies how well one can estimate the integral of a function $f$ over $[0,1)^d$ using $n$ sample points. The two classical methods, Monte Carlo (MC) and quasi-Monte Carlo (QMC), have complementary strengths and weaknesses, and a fundamental question is to design an approach that combines the benefits of both. Recently, building on the transference principle in discrepancy theory, Bansal and Jiang~\cite{BJ25a} gave a randomized QMC method that bridges MC and QMC guarantees using only i.i.d.\ samples. Their method also goes beyond the classical Koksma--Hlawka inequality: it achieves integration error $\widetilde{O}_d(\sigma_{\mathsf{SO}}(f)/n)$, where the smoothed-out variation $\sigma_{\mathsf{SO}}(f)$ can be substantially smaller than the Hardy--Krause variation that governs the classical bound. However, their algorithm requires $n^2$ i.i.d.\ samples as input, and this quadratic blowup is inherent to any method based on the transference principle. In this work, we bypass the quadratic blowup: for any constant $\varepsilon > 0$, we show that $(1+\varepsilon)n$ i.i.d.\ samples suffice to both obtain the beyond-Hardy--Krause guarantee of~\cite{BJ25a}, resolving an open problem posed there, and to produce low-discrepancy point sequences. Our algorithms are variants of the online Haar-thinning method of Dwivedi, Feldheim, Gurel-Gurevich, and Ramdas~\cite{DFG+19}.

cs.DS

Single-Exponential Algorithms and a Polynomial Kernel for Strong Connectivity Augmentation

Strong Connectivity Augmentation (SCA) asks whether a directed acyclic graph can be made strongly connected by adding at most $k$ prescribed links whose total weight is within a given budget. Klinkby, Misra, and Saurabh (SODA 2021) gave an $O^*(2^{O(k\log k)})$-time algorithm and asked whether the problem admits a single-exponential parameterized algorithm and a polynomial kernel. We answer both questions affirmatively: SCA can be solved in $O^*(9^k)$ time and admits a polynomial kernel with $O(k^4)$ vertices and $O(k^{16})$ bits. For unweighted SCA, we obtain $O^*(4^k)$ time and a kernel with $O(k^3)$ vertices. Our algorithms are based on a particularly simple reduction to Strongly Connected Spanning Subgraph with two edge costs.

cs.DS