arXiv · 1706.03103
Min-Max Regret Scheduling To Minimize the Total Weight of Late Jobs With Interval Uncertainty
Abstract
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched. Instead, only interval bounds for these parameters are given. In contrast to the stochastic optimization approach, we consider the problem of finding a robust schedule, which minimizes the maximum regret of a solution. Heuristic algorithm based on mixed-integer linear programming is presented and examined through computational experiments.
Explore related subjects
Keep this discovery
Maciej Drwal. 2017-06-09. Min-Max Regret Scheduling To Minimize the Total Weight of Late Jobs With Interval Uncertainty. https://arxiv.org/abs/1706.03103
Cite the original work for its findings. Save a collection to share your selection of sources.