Parameterized Complexity of Scheduling Chains of Jobs with Delays

Abstract

In this paper, we consider the parameterized complexity of the following scheduling problem. We must schedule a number of jobs on $m$ machines, where each job has unit length, and the graph of precedence constraints consists of a set of chains. Each precedence constraint is labelled with an integer that denotes the exact (or minimum) delay between the jobs. We study different cases; delays can be given in unary and in binary, and the case that we have a single machine is discussed separately. We consider the complexity of this problem parameterized by the number of chains, and by the thickness of the instance, which is the maximum number of chains whose intervals between release date and deadline overlap. We show that this scheduling problem with exact delays in unary is $W[t]$-hard for all $t$, when parameterized by the thickness, even when we have a single machine ($m = 1$). When parameterized by the number of chains, this problem is $W[1]$-complete when we have a single or a constant number of machines, and $W[2]$-complete when the number of machines is a variable. The problem with minimum delays, given in unary, parameterized by the number of chains (and as a simple corollary, also when parameterized by the thickness) is $W[1]$-hard for a single or a constant number of machines, and $W[2]$-hard when the number of machines is variable. With a dynamic programming algorithm, one can show membership in XP for exact and minimum delays in unary, for any number of machines, when parameterized by thickness or number of chains. For a single machine, with exact delays in binary, parameterized by the number of chains, membership in XP can be shown with branching and solving a system of difference constraints. For all other cases for delays in binary, membership in XP is open.

Explore related subjects

Keep this discovery

BibTeXRIS

Hans L. Bodlaender, Marieke van der Wegen. 2020-07-17. Parameterized Complexity of Scheduling Chains of Jobs with Delays. https://arxiv.org/abs/2007.09023

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The Computational Complexity of Holant Problems on 4-regular Graphs from the Stable Subgroup Sequence of $SL(2,\mathbb{C})$

The Holant framework provides a general setting for studying counting problems and includes graph homomorphisms (\#GH) and counting constraint satisfaction problems (\#CSP) as special cases. Over the past twenty years, a series of computational complexity dichotomies have been established for Holant problems, but the classification for complex-valued signatures is still open. The main obstacle is the case in which all signatures have even arity. In this paper, we establish a dichotomy for Holant problems with a complex-valued 4-ary signature, which is a key base case for the full classification of Holant problems. We present a new strategy by introducing Schur's theorem, the classification of finite subgroups of $\mathrm{SL}(2,\mathbb{C})$ and stable subgroup sequences into the proof. These new techniques are of independent interest.

cs.CC

Topology inside NC$^1$

We show that ACC$^0$ is precisely what can be computed with constant-width circuits of polynomial size and polylogarithmic genus. This extends a characterization given by Hansen, showing that planar constant-width circuits also characterize ACC$^0$. Thus polylogarithmic genus provides no additional computational power in this model. We consider other generalizations of planarity, including crossing number and thickness. We show that constant-width circuits of polynomial size and thickness two already suffice to capture all of NC$^1$.

cs.CC