arXiv · 2012.12788
Short-term Operational Planning Problem of the Multiple-Energy Carrier Hybrid AC/DC Microgrids
Abstract
In this paper, the short-term operation problem for a multiple energy carrier hybrid AC/DC microgrid is discussed. The hybrid microgrid consists of AC and DC parts, which are connected by means of inverters as well as natural gas network. The microgrid includes photovoltaic (PV) unit, wind turbine (WT), battery storage unit and gas-fired microturbines. A mixed integer linear programming is formed to minimize the overall cost of the microgrid including cost of natural gas supply, the value of lost load and battery degradation cost. The presented case study explored the importance of inverter characteristics and pipeline capacity.
Explore related subjects
Keep this discovery
Reza Bayani, Mohammed Bushlaibi, Saeed D. Manshadi. 2020-12-23. Short-term Operational Planning Problem of the Multiple-Energy Carrier Hybrid AC/DC Microgrids. https://doi.org/10.1109/pesgm46819.2021.9637843
Cite the original work for its findings. Save a collection to share your selection of sources.