SearcharxivSearch

arXiv · 2101.02086

On Computing Pareto Optimal Paths in Weighted Time-Dependent Networks

Abstract

A weighted point-availability time-dependent network is a list of temporal edges, where each temporal edge has an appearing time value, a travel time value, and a cost value. In this paper we consider the single source Pareto problem in weighted point-availability time-dependent networks, which consists of computing, for any destination d, all Pareto optimal pairs (t, c), where t and c are the arrival time and the cost of a path from s to d, respectively (a pair (t, c) is Pareto optimal if there is no path with arrival time smaller than t and cost no worse than c or arrival time no greater than t and better cost). We design and analyse a general algorithm for solving this problem, whose time complexity is O(M log P), where M is the number of temporal edges and P is the maximum number of Pareto optimal pairs for each node of the network. This complexity significantly improves the time complexity of the previously known solution. Our algorithm can be used to solve several different minimum cost path problems in weighted point-availability time-dependent networks with a vast variety of cost definitions, and it can be easily modified in order to deal with the single destination Pareto problem. All our results apply to directed networks, but they can be easily adapted to undirected networks with no edges with zero travel time.

Explore related subjects

Keep this discovery

BibTeXRIS

Filippo Brunelli, Pierluigi Crescenzi, Laurent Viennot. 2021-01-06. On Computing Pareto Optimal Paths in Weighted Time-Dependent Networks. https://arxiv.org/abs/2101.02086

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Quasi-Monte Carlo Beyond Hardy-Krause II: $(1 + \varepsilon)n$ Samples Suffice

Numerical integration studies how well one can estimate the integral of a function $f$ over $[0,1)^d$ using $n$ sample points. The two classical methods, Monte Carlo (MC) and quasi-Monte Carlo (QMC), have complementary strengths and weaknesses, and a fundamental question is to design an approach that combines the benefits of both. Recently, building on the transference principle in discrepancy theory, Bansal and Jiang~\cite{BJ25a} gave a randomized QMC method that bridges MC and QMC guarantees using only i.i.d.\ samples. Their method also goes beyond the classical Koksma--Hlawka inequality: it achieves integration error $\widetilde{O}_d(\sigma_{\mathsf{SO}}(f)/n)$, where the smoothed-out variation $\sigma_{\mathsf{SO}}(f)$ can be substantially smaller than the Hardy--Krause variation that governs the classical bound. However, their algorithm requires $n^2$ i.i.d.\ samples as input, and this quadratic blowup is inherent to any method based on the transference principle. In this work, we bypass the quadratic blowup: for any constant $\varepsilon > 0$, we show that $(1+\varepsilon)n$ i.i.d.\ samples suffice to both obtain the beyond-Hardy--Krause guarantee of~\cite{BJ25a}, resolving an open problem posed there, and to produce low-discrepancy point sequences. Our algorithms are variants of the online Haar-thinning method of Dwivedi, Feldheim, Gurel-Gurevich, and Ramdas~\cite{DFG+19}.

cs.DS

Single-Exponential Algorithms and a Polynomial Kernel for Strong Connectivity Augmentation

Strong Connectivity Augmentation (SCA) asks whether a directed acyclic graph can be made strongly connected by adding at most $k$ prescribed links whose total weight is within a given budget. Klinkby, Misra, and Saurabh (SODA 2021) gave an $O^*(2^{O(k\log k)})$-time algorithm and asked whether the problem admits a single-exponential parameterized algorithm and a polynomial kernel. We answer both questions affirmatively: SCA can be solved in $O^*(9^k)$ time and admits a polynomial kernel with $O(k^4)$ vertices and $O(k^{16})$ bits. For unweighted SCA, we obtain $O^*(4^k)$ time and a kernel with $O(k^3)$ vertices. Our algorithms are based on a particularly simple reduction to Strongly Connected Spanning Subgraph with two edge costs.

cs.DS