arXiv · 2201.04196
A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint
Abstract
As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. [3] recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. [3]. More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial-time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant.
Explore related subjects
Keep this discovery
Weitian Tong, Yao Xu, Huili Zhang. 2022-01-11. A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint. https://doi.org/10.1016/j.tcs.2022.04.044
Cite the original work for its findings. Save a collection to share your selection of sources.