Design Considerations for Fermilab Multi-MW Proton Facility in the DUNE/LBNF era
Abstract
Fermilab has submitted two Snowmass whitepapers on a future 2.4~MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between these two scenarios, emphasizing the commonalities and tracing the differences to their original design questions. In addition to a high-level summary of the two 2.4~MW upgrade scenarios, there is a brief discussion of staging, beamline capabilities, subsequent upgrades, and relevant R\&D. We are proposing a vigorous program to address various challenges associated with each scenario and to down-select the concept, most suitable to provide proton beams for years to come.
Explore related subjects
Keep this discovery
Jeffrey Eldred, Sergei Nagaitsev, Vladimir Shiltsev, Alexander Valishev, Robert Zwaska, Michael Syphers. 2022-03-15. Design Considerations for Fermilab Multi-MW Proton Facility in the DUNE/LBNF era. https://arxiv.org/abs/2203.08276
Cite the original work for its findings. Save a collection to share your selection of sources.