arXiv · 2302.00348
DEIM vs. leverage scores for time-parallel construction of problem-adapted basis functions
Abstract
To tackle heterogeneous time-dependent problems, an algorithm that constructs problem-adapted basis functions in an embarrassingly parallel and local manner in time has recently been proposed in [Schleuss, Smetana, ter Maat, SIAM J. Sci. Comput., 2022+]. Several simulations of the problem are performed for only few time steps in parallel by starting at different, randomly drawn start time points. For this purpose, data-dependent probability distributions that are based on the (time-dependent) data functions of the problem, such as leverage scores, are employed. In this paper, we suggest as a key new contribution to perform a deterministic time point selection based on the (discrete) empirical interpolation method (DEIM) within the proposed algorithm. In numerical experiments we investigate the performance of a DEIM based time point selection and compare it to the leverage score sampling approach.
Explore related subjects
Keep this discovery
Julia Schleuß, Kathrin Smetana. 2023-02-01. DEIM vs. leverage scores for time-parallel construction of problem-adapted basis functions. https://arxiv.org/abs/2302.00348
Cite the original work for its findings. Save a collection to share your selection of sources.