arXiv · 2401.04653
Time-certified Input-constrained NMPC via Koopman Operator
Abstract
Determining solving-time certificates of nonlinear model predictive control (NMPC) implementations is a pressing requirement when deploying NMPC in production environments. Such a certificate guarantees that the NMPC controller returns a solution before the next sampling time. However, NMPC formulations produce nonlinear programs (NLPs) for which it is very difficult to derive their solving-time certificates. Our previous work, Wu and Braatz (2023), challenged this limitation with a proposed input-constrained MPC algorithm having exact iteration complexity but was restricted to linear MPC formulations. This work extends the algorithm to solve input-constrained NMPC problems, by using the Koopman operator and a condensing MPC technique. We illustrate the algorithm performance on a high-dimensional, nonlinear partial differential equation (PDE) control case study, in which we theoretically and numerically certify the solving time to be less than the sampling time.
Explore related subjects
Keep this discovery
Liang Wu, Krystian Ganko, Richard D. Braatz. 2024-01-09. Time-certified Input-constrained NMPC via Koopman Operator. https://arxiv.org/abs/2401.04653
Cite the original work for its findings. Save a collection to share your selection of sources.