arXiv · 2506.13281
EPC Framework for BESS Projects
Abstract
Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study.
Explore related subjects
Keep this discovery
Zeenat Hameed, Chresten Træholt. 2025-06-16. EPC Framework for BESS Projects. https://arxiv.org/abs/2506.13281
Cite the original work for its findings. Save a collection to share your selection of sources.