arXiv · 2603.29851
Simultaneous Optimization of Electric Ferry Operations and Charging Infrastructure
Abstract
Electrification of marine transport is a promising solution to reduce sector greenhouse gas emissions and operational costs. However, the large upfront cost of electric vessels and the required charging infrastructure can be a barrier to the development of this technology. Optimization algorithms that jointly design the charging infrastructure and the operation of electric vessels can help to reduce these costs and make these projects viable. In this paper, we present a mixed-integer linear programming optimization framework that jointly schedules ferry operations, charging infrastructure and ship battery size. We analyze our algorithms with the case of the China Zorrilla, the largest electric ferry in the world, which will operate between Buenos Aires and Colonia del Sacramento in 2025. We find that the joint system and operations design can reduce the total costs by 7.8\% compared to a scenario with fixed power limits and no port energy management system.
Explore related subjects
Keep this discovery
Juan Pablo Bertucci, Theo Hofman, Mauro Salazar. 2026-03-31. Simultaneous Optimization of Electric Ferry Operations and Charging Infrastructure. https://doi.org/10.1109/ests62818.2025.11152468
Cite the original work for its findings. Save a collection to share your selection of sources.