arXiv · 2611.15364
Planning-Stage Assessment of Battery-Supported Regional Islanding: A South Australian Case Study
Abstract
Power systems with high shares of renewable generation may face increased operational vulnerability under regional islanding caused by the loss of major inter-area transmission interfaces. This paper presents a planning-stage transmission-level assessment of regional islanding with battery storage, using a South Australian case study based on a synthetic representation of the Australian National Electricity Market (NEM). An interconnected planning baseline is compared with a stress test scenario involving complete regional-islanding over a 24-hour chronological horizon. The framework quantifies peak unserved power, total unserved energy, and the duration of unserved demand, while characterising battery redispatch and the synchronous inertia accessible to the subsystem.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Yunqi Wang, Nanduni Nimalsiri, Ghulam Mohy-ud-din, Thomas Brinsmead. 2026-11-11. Planning-Stage Assessment of Battery-Supported Regional Islanding: A South Australian Case Study. https://searcharxiv.com/abs/2611.15364
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Searcharxiv by Indiciae: BibTeX · RIS.