arXiv · physics/0008079
Linac Lue200. First Testing Results
Abstract
"LUE200" - 200 MeV electron linac is being created at JINR as a driver of the pulsed neutron source "IREN" [1]. The special full-scale facilities for testing the main systems of LUE-200 (FSTF) are used at JINR, BINP, MEPhI and YerPhI [2]. The verification of the linac accelerating system is providing at the VEPP-5 preinjector constructed at BINP [3]. The accelerating system of LUE200 includes two S-band (2856 MHz) accelerating sections of 3 m long. The sections are connected with modulator based one 5045 klystron (SLAC production). There are SLED-systems for the multiplying the pulse RF power. The first results of the accelerating system test on the VEPP-5 preinjector are presented. The electron beam energy up to 92 MeV and consequently average rate of acceleration of the electron beam more than 30 MeV/m were achieved after acceleration in one section.
Explore related subjects
Keep this discovery
S. N. Dolya, W. I. Furman, V. V. Kobets, E. M. Laziev, Yu. A. Metelkin, V. A. Shvets, A. P. Soumbaev. 2000-08-16. Linac Lue200. First Testing Results. https://arxiv.org/abs/physics/0008079
Cite the original work for its findings. Save a collection to share your selection of sources.