SearcharxivSearch

arXiv subjects

A. Lorenzon

Publications and source records attributed to A. Lorenzon.

2 recordsLinked to original sources

BLEMAB European project: muon imaging technique applied to blast furnaces

The BLEMAB European project (BLast furnace stack density Estimation through online Muon ABsorption measurements), evolution of the previous MuBlast European project, is designed to investigate in detail the capability of muon radiography techniques applied to the imaging of a blast furnace's inner zone. In particular, the geometry and size of the so called cohesive zone, i.e. the spatial zone where the slowly downward moving material begins to soften and melt, that plays an important role in the performance of the blast furnace itself. Thanks to the high penetration power of the natural cosmic ray muon radiation, muon transmission radiography represents an appropriate non-invasive methodology for imaging large high-density structures such as blast furnaces, whose linear size can be up to a few tens of meters. A state-of-the-art muon tracking system, whose design profits from the long experience of our collaboration in this field, is currently under development and will be installed in 2022 at a blast furnace on the ArcelorMittal site in Bremen (Germany) for many months. Collected data will be exploited to monitor temporal variations of the average density distribution inside the furnace. Muon radiography results will also be compared with measurements obtained through an enhanced multipoint probe and standard blast furnace models.

physics.ins-det

Positron driven muon source for a muon collider

The design of a future multi-TeV muon collider needs new ideas to overcome the technological challenges related to muon production, cooling, accumulation and acceleration. In this paper a layout of a positron driven muon source known as the Low EMittance Muon Accelerator (LEMMA) concept is presented. The positron beam, stored in a ring with high energy acceptance and low emittance, is extracted and driven to a multi-target system, to produce muon pairs at threshold. This solution alleviates the issues related to the power deposited and the integrated Peak Energy Density Deposition (PEDD) on the targets. Muons produced in the multi-target system will then be accumulated before acceleration and injection in the collider. A multi-target line lattice has been designed to cope with the focusing of both the positron and muon beams. Studies on the number, material and thickness of the targets have been carried out. A general layout of the overall scheme and a description is presented, as well as plans for future R&D.

physics.acc-ph