Searcharxiv⌕ Search

arXiv subjects

Ajitesh Srivastava

Publications and source records attributed to Ajitesh Srivastava.

38 records · Page 3Linked to original sources

Optimizing Inter-Datacenter Tail Flow Completion Times using Best Worst-case Routing

Flow routing over inter-datacenter networks is a well-known problem where the network assigns a path to a newly arriving flow potentially according to the network conditions and the properties of the new flow. An essential system-wide performance metric for a routing algorithm is the flow completion times, which affect the performance of applications running across multiple datacenters. Current static and dynamic routing approaches do not take advantage of flow size information in routing, which is practical in a controlled environment such as inter-datacenter networks that are managed by the datacenter operators. In this paper, we discuss Best Worst-case Routing (BWR), which aims at optimizing the tail completion times of long-running flows over inter-datacenter networks with non-uniform link capacities. Since finding the path with the best worst-case completion time for a new flow is NP-Hard, we investigate two heuristics, BWRH and BWRHF, which use two different upper bounds on the worst-case completion times for routing. We evaluate BWRH and BWRHF against several real WAN topologies and multiple traffic patterns. Although BWRH better models the BWR problem, BWRH and BWRHF show negligible difference across various system-wide performance metrics, while BWRHF being significantly faster. Furthermore, we show that compared to other popular routing heuristics, BWRHF can reduce the mean and tail flow completion times by over $1.5\times$ and $2\times$, respectively.

cs.NI↗

On Minimizing the Completion Times of Long Flows over Inter-Datacenter WAN

Long flows contribute huge volumes of traffic over inter-datacenter WAN. The Flow Completion Time (FCT) is a vital network performance metric that affects the running time of distributed applications and the users' quality of experience. Flow routing techniques based on propagation or queuing latency or instantaneous link utilization are insufficient for minimization of the long flows' FCT. We propose a routing approach that uses the remaining sizes and paths of all ongoing flows to minimize the worst-case completion time of incoming flows assuming no knowledge of future flow arrivals. Our approach can be formulated as an NP-Hard graph optimization problem. We propose BWRH, a heuristic to quickly generate an approximate solution. We evaluate BWRH against several real WAN topologies and two different traffic patterns. We see that BWRH provides solutions with an average optimality gap of less than $0.25\%$. Furthermore, we show that compared to other popular routing heuristics, BWRH reduces the mean and tail FCT by up to $1.46\times$ and $1.53\times$, respectively.

cs.NI↗