SearcharxivSearch

arXiv subjects

Asim Ahmed

Publications and source records attributed to Asim Ahmed.

2 recordsLinked to original sources

MedLLM: An Open Medical Language Model at the Sub-Billion Scale

Open medical language models have converged on a single scale: every widely used system runs at 7B parameters or more, leaving the sub-billion regime uncharacterized. We present MedLLM, an open 0.1B-parameter medical language model trained through a fully open three-phase pipeline: general pretraining with curriculum sequence-length scheduling, domain fine-tuning on MedFineWeb, a reference-guided medical corpus we release that is selected from general web data by embedding similarity to medical question-answering (QA) data, and preference-aligned fine-tuning combining SFT with direct preference optimization (DPO). Across medical benchmarks, MedLLM shows a pattern visible only at sub-billion scale: medical competence does not degrade uniformly under compression but splits by task type. On context-grounded QA it comes within $2.9$pp of a medically adapted 7B model and surpasses the instruction-tuned and general-purpose 7B baselines; on knowledge-recall QA it stays near the task floor on clinical-vignette MedQA yet significantly exceeds every 7B and sub-7B baseline on MedMCQA, indicating that where recall fails the constraint is model capacity rather than adaptation. This dissociation is masked at 7B, where both capabilities are present, and surfaces only when capacity is scarce.

cs.AI

Sustained cost declines in solar PV and battery storage needed to eliminate coal generation in India

Unabated coal power in India must be phased out by mid-century to achieve global climate targets under the Paris Agreement. Here we estimate the costs of hybrid power plants - lithium-ion battery storage with wind and solar PV - to replace coal generation. We design least cost mixes of these technologies to supply stylized baseload and load-following generation profiles in three Indian states - Karnataka, Gujarat, and Tamil Nadu. Our analysis shows that availability of low cost capital, solar PV capital costs of at least $250/kW, and battery storage capacity costs at least 50% cheaper than current levels will be required to phase out existing coal power plants. Phaseout by 2040 requires a 6% annual decline in the cost of hybrid systems over the next two decades. We find that replacing coal generation with hybrid systems 99% of the hours over multiple decades is roughly 40% cheaper than 100% replacement, indicating a key role for other low cost grid flexibility mechanisms to help hasten coal phaseout. Solar PV is more suited to pairing with short duration storage than wind power. Overall, our results describe the challenging technological and policy advances needed to achieve the temperature goals of the Paris Agreement.

econ.GN