AI Agents Executing an RMS and EMT Ride-Through Workflow on a 2,000-Bus Synthetic Texas Grid: A Case Study with Open-Source Tools

This paper reports a case study of engineer-supervised AI agents executing a predefined RMS and EMT ride-through workflow on the 2,000-bus ACTIVSg2000 synthetic Texas grid with open-source tools. The test case is a 133 MW battery with a co-located 130 MW data-center load, assessed against ride-through criteria fixed before simulation and for loss of synchronism elsewhere in the grid. One agent ran 44 RMS cases and 15 without-project comparisons in ANDES; the other ran a 220-row EMT intake bench and an 84-row system study in DPsim and ParaEMT on a Kron-reduced area. Across the 44 RMS cases, 127 criterion cells fail, including loss of synchronism in all 44. Two findings concern the project plant. The battery keeps absorbing reactive power during sags on the light-load schedule (B3, as low as -19.8 Mvar on S4 T1), and the data-center load returns only at 5.00-5.56 s after long bolted faults (L3), which misses the ERCOT load-return requirement. In 13 of the 15 comparisons, which the authors selected after slips or speed-gate stops, the same machines slip without the project; the other 29 runs have no without-project comparison. RMS and EMT values differ in network, plant model, controls, operating point, and base, and so they are reported as separate, unaligned observations. The paper reports the errors the authors identified in the agent logs, 63 author messages, and 3.8 days from agent start to the integrated study report. The agents executed and documented the predefined ride-through and stability workflow, which covers one part of an interconnection study.

eess.SY↗

Benchmarking a Grid Foundation Model for AC Optimal Power Flow: Feasibility and Warm-Start Results on Synthetic Texas and South Carolina Grids

Learning-based surrogates for alternating-current optimal power flow (AC-OPF) are often judged by the gap between their objective value and that of a nonlinear solver, which does not show that a prediction satisfies power balance and network limits. This paper tests whether predictions from the pretrained foundation model GridSFM-Open 1.1.0, recently released by Microsoft, are feasible AC-OPF operating points and whether they are useful initial values for a nonlinear solver. The model was evaluated zero-shot and after fine-tuning on 10, 100, and 1,000 labeled scenarios (FT10, FT100, and FT1000) on 500 scenarios for each of two synthetic grids, ACTIVSg2000 (Texas) and ACTIVSg500 (South Carolina), with Ipopt, MATPOWER MIPS, and pandapower PIPS as solver references. The lowest Texas median cost gap, 0.44\% for FT100, coincided with thermal violations in 24.1\% of cases and a median maximum bus power mismatch of 89 MW and 197 Mvar. Texas zero-shot predictions had a median maximum mismatch of 648 MW and 1,641 Mvar, and every South Carolina case violated a thermal limit for every model variant. Seeding Ipopt with FT1000 predictions gave geometric-mean solve-time speedups of 1.55x on South Carolina and 1.12x on Texas (p = 0.06, not significant at the 5\% level), while zero-shot seeds slowed South Carolina solves (0.26x). A small objective gap therefore did not indicate feasibility: although median zero-shot inference took only 1.32 s on Texas and 0.157 s on South Carolina on a shared host, every prediction still required a nonlinear solver, and fine-tuned predictions gave modest, grid-dependent warm-start speedups while zero-shot predictions slowed convergence on one grid. GridSFM may therefore be useful for initializing a nonlinear solver, but obtaining feasible AC-OPF solutions still required the solver.