Medical Applications

The use of a ccelerators for medical applications has evolved from initial experimentation to turn-key devices commonly operating in hospitals. New applications are continuously being developed around the world, and the hadrontherapy facilities of the newest generation are placed at the frontier between industrial production and advanced R&D. An introduction to the different medical application accelerators is followed by a description of the hadrontherapy facilities, with special emphasis on CNAO, and the report closes with a brief outlook on the future of this field.

physics.acc-ph

Technical Design Report EuroGammaS proposal for the ELI-NP Gamma beam System

The machine described in this document is an advanced Source of up to 20 MeV Gamma Rays based on Compton back-scattering, i.e. collision of an intense high power laser beam and a high brightness electron beam with maximum kinetic energy of about 720 MeV. Fully equipped with collimation and characterization systems, in order to generate, form and fully measure the physical characteristics of the produced Gamma Ray beam. The quality, i.e. phase space density, of the two colliding beams will be such that the emitted Gamma ray beam is characterized by energy tunability, spectral density, bandwidth, polarization, divergence and brilliance compatible with the requested performances of the ELI-NP user facility, to be built in Romania as the Nuclear Physics oriented Pillar of the European Extreme Light Infrastructure. This document illustrates the Technical Design finally produced by the EuroGammaS Collaboration, after a thorough investigation of the machine expected performances within the constraints imposed by the ELI-NP tender for the Gamma Beam System (ELI-NP-GBS), in terms of available budget, deadlines for machine completion and performance achievement, compatibility with lay-out and characteristics of the planned civil engineering.

physics.acc-ph

Proposal for taking data with the KLOE-2 detector at the DA$Φ$NE collider upgraded in energy

This document reviews the physics program of the KLOE-2 detector at DA$Φ$NE upgraded in energy and provides a simple solution to run the collider above the $ϕ$-peak (up to 2, possibly 2.5 GeV). It is shown how a precise measurement of the multihadronic cross section in the energy region up to 2 (possibly 2.5) GeV would have a major impact on the tests of the Standard Model through a precise determination of the anomalous magnetic moment of the muon and the effective fine-structure constant at the $M_Z$ scale. With a luminosity of about $10^{32}$cm$^{-2}$s$^{-1}$, DA$Φ$NE upgraded in energy can perform a scan in the region from 1 to 2.5 GeV in one year by collecting an integrated luminosity of 20 pb$^{-1}$ (corresponding to a few days of data taking) for single point, assuming an energy step of 25 MeV. A few years of data taking in this region would provide important tests of QCD and effective theories by $γγ$ physics with open thresholds for pseudo-scalar (like the $η'$), scalar ($f_0,f'_0$, etc...) and axial-vector ($a_1$, etc...) mesons; vector-mesons spectroscopy and baryon form factors; tests of CVC and searches for exotics. In the final part of the document a technical solution for the energy upgrade of DA$Φ$NE is proposed.

hep-ex

Da$Φ$ne developments for the KLOE-2 experimental run

Recently the peak luminosity achieved on the DAΦNE collider has been improved by almost a factor three by implementing a novel collision scheme based on large Piwinski angle and Crab-Waist. This encouraging result opened new perspectives for physics research and a new run with the KLOE-2 detector has been scheduled to start by spring 2010. The KLOE-2 installation is a complex operation requiring a careful design effort and a several months long shutdown. The high luminosity interaction region has been deeply revised in order to take into account the effect on the beam caused by the solenoidal field of the experimental detector and to ensure background rejection. The shutdown has been also used to implement several other modifications aimed at improving beam dynamics: the wiggler poles have been displaced from the magnet axis in order to cancel high order terms in the field, the feedback systems have been equipped with stronger power supplies and more efficient kickers and electrodes have been inserted inside the wiggler and the dipole vacuum chambers, in the positron ring, to avoid the e-cloud formation. A low level RF feedback has been added to the cavity control in both rings.

physics.acc-ph

Design considerations for future DAFNE upgrade

The Frascati F-Factory DAFNE has been delivering luminosity to the KLOE, DEAR and FINUDA experiments since year 2000. Since April 2004 the KLOE run has been resumed and recently peak luminosity of 1.0x1032 cm-2s-1 and integrated luminosity of 6.2 pb-1/day have been achieved. The scientific program of the three high-energy experiments sharing DAFNE operation will be completed approximately by the end of year 2006. A scientific program for DAFNE beyond that date has not been defined yet and it is matter of discussion in the high-energy physics and accelerator physics communities. In this paper we present some future scenarios for DAFNE, discussing the expected ultimate performances of the machine as it is now and addressing the design for an energy and/or luminosity upgrade. The options presented in the following are not exhaustive and they are intended to give a glance of what is doable using the existing infrastructures.

physics.acc-ph

DAFNE operation with the FINUDA experiment

DAFNE operation restarted in September 2003, after a six month shut-down for the installation of FINUDA, a magnetic detector dedicated to the study of hypernuclear physics. FINUDA is the third experiment running on DAFNE and operates while keeping on place the other detector KLOE. During the shut-down both Interaction Regions have been equipped with remotely controlled quadrupoles in order to operate at different solenoid fields. Among many other hardware upgrades one of the most significant is the reshaping of the wiggler pole profile to improve the field quality and the machine dynamic aperture. Commissioning of the collider in the new configuration has been completed in short time. The peak luminosity delivered to FINUDA has reached 6 10^31 s-1cm-2, with a daily integrated value close to 4 pb-1.

physics.acc-ph

DAFNE

The results of 2002 DAFNE operation for the two experiments KLOE and DEAR are described. During 2003 a long shutdown has been dedicated to the installation of new Interaction Regions (IR) and to hardware modifications and upgrades. In the last section optics studies and performances expectations for the new machine configuration are reported.

physics.acc-ph

Results from the Alghero Workshop on e+e- in the 1-2 GeV range

In the post-LEP era the high energy frontier is reachable only by large scale collaborations and laboratories, while the present lepton colliders operating at low and intermediate energies are planning major upgrades aimed at increasing substantially their luminosity, in order to meet the continuous interest in precision physics. The lowest energies are now represented by DAPHNE (1.02 GeV cm, operating at Frascati), VEPP-2000 (from 1 to 2 GeV, in construction at Novosibirsk), CESR (presently operating at Cornell in the range between 3 to 12 GeV), BEPC (presently operating in Beijing in the range 2 to 5.6 GeV, foreseen luminosity upgrade). A workshop has been held to discuss both the physics issues and the strategies and problems towards higher luminosities in the energy range mainly but not only between 1 and 2 GeV. The workshop was intended to clarify which experiments are more appealing to the physics community, and which is the way to proceed for obtaining the necessary luminosity.

physics.acc-ph

Lattice for Longitudinal Low-Beta

The guidelines for a phi-factory at very high luminosity are described. A preliminary design for a double ring collider, DAPHNE-II, is presented, fulfilling the requirements of luminosity of the order of 10^34 cm-2sec-1

physics.acc-ph

Upgrades of Particle Factories

Recently the luminosity frontier has been raised by the Beauty factories. Higher precision measurements at the energies between the PHI and the Beauty are being projected, and the corresponding increase of luminosity by orders of magnitude is being faced by the accelerator community. The main upgrades and plans in the factories presently in operation or construction around the world are here summarized.