SearcharxivSearch

arXiv subjects

C. Spencer

Publications and source records attributed to C. Spencer.

3 recordsLinked to original sources

A multi-chord stellar occultation by the large trans-Neptunian object (174567) Varda

We present results from the first recorded stellar occultation by the large trans-Neptunian object (174567) Varda that was observed on September 10$^{\rm th}$, 2018. Varda belongs to the high-inclination dynamically excited population, and has a satellite, Ilmarë, which is half the size of Varda. We determine the size and albedo of Varda and constrain its 3D shape and density. Thirteen different sites in the USA monitored the event, five of which detected an occultation by the main body. A best-fitting ellipse to the occultation chords provides the instantaneous limb of the body, from which the geometric albedo is computed. The size and shape of Varda are evaluated, and its bulk density is constrained, using Varda's mass known from previous works. The best-fitting elliptical limb has semi-major (equatorial) axis of $(383 \pm 3)$km and an apparent oblateness $0.066\pm0.047$ corresponding to an apparent area-equivalent radius $R'_{\rm equiv}= (370\pm7)$km and geometric albedo $p_v=0.099\pm 0.002 $ assuming a visual absolute magnitude $H_V=3.81\pm0.01$. Using three possible rotational periods for the body (4.76h, 5.91h, and 7.87h), we derive corresponding MacLaurin solutions. Furthermore, given the low-amplitude ($0.06\pm0.01$) mag of the single-peaked rotational light-curve for the aforementioned periods, we consider the double periods. For the 5.91h period (the most probable) and its double (11.82h), we find bulk densities and true oblateness of $ρ=(1.78\pm0.06)$ g cm$^{-3}$, $ε=0.235\pm0.050$ and $ρ=(1.23\pm0.04)$ g cm$^{-3}$, $ε=0.080\pm0.049$. However, it must be noted that the other solutions cannot be excluded just yet.

astro-ph.EP

Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.

physics.acc-ph

The 2 mrad crossing-angle ILC interaction region and extraction line

A complete optics design for the 2mrad crossing angle interaction region and extraction line was presented at Snowmass 2005. Since this time, the design task force has been working on developing and improving the performance of the extraction line. The work has focused on optimising the final doublet parameters and on reducing the power losses resulting from the disrupted beam transport. In this paper, the most recent status of the 2mrad layout and the corresponding performance are presented.

physics.acc-ph