Searcharxiv⌕ Search

arXiv subjects

Clifford Stein

Publications and source records attributed to Clifford Stein.

20 records · Page 2Linked to original sources

Parallel Graph Connectivity in Log Diameter Rounds

We study graph connectivity problem in MPC model. On an undirected graph with $n$ nodes and $m$ edges, $O(\log n)$ round connectivity algorithms have been known for over 35 years. However, no algorithms with better complexity bounds were known. In this work, we give fully scalable, faster algorithms for the connectivity problem, by parameterizing the time complexity as a function of the diameter of the graph. Our main result is a $O(\log D \log\log_{m/n} n)$ time connectivity algorithm for diameter-$D$ graphs, using $Θ(m)$ total memory. If our algorithm can use more memory, it can terminate in fewer rounds, and there is no lower bound on the memory per processor. We extend our results to related graph problems such as spanning forest, finding a DFS sequence, exact/approximate minimum spanning forest, and bottleneck spanning forest. We also show that achieving similar bounds for reachability in directed graphs would imply faster boolean matrix multiplication algorithms. We introduce several new algorithmic ideas. We describe a general technique called double exponential speed problem size reduction which roughly means that if we can use total memory $N$ to reduce a problem from size $n$ to $n/k$, for $k=(N/n)^{Θ(1)}$ in one phase, then we can solve the problem in $O(\log\log_{N/n} n)$ phases. In order to achieve this fast reduction for graph connectivity, we use a multistep algorithm. One key step is a carefully constructed truncated broadcasting scheme where each node broadcasts neighbor sets to its neighbors in a way that limits the size of the resulting neighbor sets. Another key step is random leader contraction, where we choose a smaller set of leaders than many previous works do.

cs.DS↗

An O(log log m)-competitive Algorithm for Online Machine Minimization

This paper considers the online machine minimization problem, a basic real time scheduling problem. The setting for this problem consists of n jobs that arrive over time, where each job has a deadline by which it must be completed. The goal is to design an online scheduler that feasibly schedules the jobs on a nearly minimal number of machines. An algorithm is c-machine optimal if the algorithm will feasibly schedule a collection of jobs on cm machines if there exists a feasible schedule on m machines. For over two decades the best known result was a O(log P)-machine optimal algorithm, where P is the ratio of the maximum to minimum job size. In a recent breakthrough, a O(log m)-machine optimal algorithm was given. In this paper, we exponentially improve on this recent result by giving a O(log log m)-machine optimal algorithm.

cs.DS↗