Parameterized complexity of scheduling unit-time jobs with generalized precedence constraints

We study the parameterized complexity of scheduling unit-time jobs on parallel, identical machines under generalized precedence constraints for minimization of the makespan and the sum of completion times. In our setting, each job is equipped with a Boolean formula (precedence constraint) over the set of jobs. A schedule satisfies a job's precedence constraint if setting earlier jobs to true satisfies the formula. Our definition generalizes several common types of precedence constraints: classical and-constraints if every formula is a conjunction, or-constraints if every formula is a disjunction, and and/or-constraints if every formula is in conjunctive normal form. We prove fixed-parameter tractability when parameterizing by the number of predecessors. For parameterization by the number of successors, however, the complexity depends on the structure of the precedence constraints. If every constraint is a conjunction or a disjunction, we prove the problem to be fixed-parameter tractable. For constraints in disjunctive normal form, we prove W[1]-hardness. We show that the and/or-constrained problem is NP-hard, even for a single successor. Moreover, we prove NP-hardness on two machines if every constraint is a conjunction or a disjunction. This result not only proves para-NP-hardness for parameterization by the number of machines but also complements the polynomial-time solvability on two machines if every constraint is a conjunction (Coffman and Graham 1972) or if every constraint is a disjunction (Berit 2005).

math.OC

Minimum-Peak-Cost Flows Over Time

When planning transportation whose operation requires non-consumable resources, the peak demand for allocated resources is often of higher interest than the duration of resource usage. For instance, it is more cost-effective to deliver parcels with a single truck over eight hours than to use two trucks for four hours, as long as the time suffices. To model such scenarios, we introduce the novel minimum peak cost flow over time problem, whose objective is to minimise the maximum cost at all points in time rather than minimising the integral of costs. We focus on minimising peak costs of temporally repeated flows. These are desirable for practical applications due to their simple structure. This yields the minimum-peak-cost temporally repeated flow problem (MPC-TRF). We show that the simple structure of temporally repeated flows comes with the drawback of arbitrarily bad approximation ratios compared to general flows over time. Furthermore, our complexity analysis shows the integral version of MPC-TRF is strongly NP-hard, even under strong restrictions. On the positive side, we identify two benign special cases: unit-cost series-parallel networks and networks with time horizon at least twice as long as the longest path in the network (with respect to the transit time). In both cases, we show that integral optimal flows if the desired flow value equals the maximum flow value and fractional optimal flows for arbitrary flow values can be found in polynomial time. For each of these cases, we provide an explicit algorithm that constructs an optimal solution.

cs.DS

Special Cases of the Minimum Spanning Tree Problem under Explorable Edge and Vertex Uncertainty

This article studies the Minimum Spanning Tree Problem under Explorable Uncertainty as well as a related vertex uncertainty version of the problem. We particularly consider special instance types, including cactus graphs, for which we provide randomized algorithms. We introduce the problem of finding a minimum weight spanning star under uncertainty for which we show that no algorithm can achieve constant competitive ratio.

cs.DS