Searcharxiv⌕ Search

arXiv subjects

Cristian Cortes-Aguirre

Publications and source records attributed to Cristian Cortes-Aguirre.

3 recordsLinked to original sources

Baseline-improved Economic Model Predictive Control for Optimal Microgrid Dispatch

Economic Model Predictive Control (EMPC) optimizes economic performance over a prediction horizon rather than stabilizing to a reference, making it attractive for microgrid (MG) dispatch. However, since load and generation forecasts are known only 24-48 h ahead, economically optimal steady states or periodic trajectories are unavailable, and EMPC works relying on such signals are inadequate. Moreover, demand charges, based on the maximum monthly grid import, cannot be easily cast as an additive cost, which prevents a naive application of the principle of optimality. We propose to close this mismatch between the EMPC prediction horizon and monthly timescales via an appropriately generated baseline reference trajectory. We first propose an EMPC formulation for a generic deterministic discrete nonlinear time-varying system subject to hard state and input constraints. We then show that, under appropriate terminal ingredients -- sequential control invariance of the terminal region and a terminal control law causing a Lyapunov-like decrease of the terminal cost -- the asymptotic average economic cost of the proposed method is no worse than a baseline given by any arbitrary reference trajectory known only online. This yields a practical, finite-time upper bound on the average economic cost difference with the baseline that decreases linearly to zero as time goes to infinity. We then show how the framework solves optimal MG dispatch problems, introducing costs and constraints that conform to the required assumptions. Using data from the Port of San Diego MG, realistic simulations demonstrate that the proposed method reduces monthly electricity costs in closed loop relative to reference trajectories generated either by optimizing the electricity cost over the prediction horizon or by tracking an ideal grid import curve.

eess.SY↗

Adaptive Relaxation based Non-Conservative Chance Constrained Stochastic MPC

Chance constrained stochastic model predictive controllers (CC-SMPC) trade off full constraint satisfaction for economical plant performance under uncertainty. Previous CC-SMPC works are over-conservative in constraint violations leading to worse economic performance. Other past works require a-priori information about the uncertainty set, limiting their application. This paper considers a discrete LTI system with hard constraints on inputs and chance constraints on states, with unknown uncertainty distribution, statistics, or samples. This work proposes a novel adaptive online update rule to relax the state constraints based on the time-average of past constraint violations, to achieve reduced conservativeness in closed-loop. Under an ideal control policy assumption, it is proven that the time-average of constraint violations asymptotically converges to the maximum allowed violation probability. The method is applied for optimal battery energy storage system (BESS) dispatch in a grid connected microgrid with PV generation and load demand, with chance constraints on BESS state-of-charge (SOC). Realistic simulations show the superior electricity cost saving potential of the proposed method as compared to the traditional economic MPC without chance constraints, and a state-of-the-art approach with chance constraints. We satisfy the chance constraints non-conservatively in closed-loop, effectively trading off increased cost savings with minimal adverse effects on BESS lifetime.

eess.SY↗

Economic MPC with an Online Reference Trajectory for Battery Scheduling Considering Demand Charge Management

Monthly demand charges form a significant portion of the electric bill for microgrids with variable renewable energy generation. A battery energy storage system (BESS) is commonly used to manage these demand charges. Economic model predictive control (EMPC) with a reference trajectory can be used to dispatch the BESS to optimize the microgrid operating cost. Since demand charges are incurred monthly, EMPC requires a full-month reference trajectory for asymptotic stability guarantees that result in optimal operating costs. However, a full-month reference trajectory is unrealistic from a renewable generation forecast perspective. Therefore, to construct a practical EMPC with a reference trajectory, an EMPC formulation considering both non-coincident demand and on-peak demand charges is designed in this work for 24 to 48 h prediction horizons. The corresponding reference trajectory is computed at each EMPC step by solving an optimal control problem over 24 to 48 h reference (trajectory) horizon. Furthermore, BESS state of charge regulation constraints are incorporated to guarantee the BESS energy level in the long term. Multiple reference and prediction horizon lengths are compared for both shrinking and rolling horizons with real-world data. The proposed EMPC with 48 h rolling reference and prediction horizons outperforms the traditional EMPC benchmark with a 2% reduction in the annual cost, proving its economic benefits.

eess.SY↗