SearcharxivSearch

arXiv subjects

D. K. Morris

Publications and source records attributed to D. K. Morris.

3 recordsLinked to original sources

The Liquidus Temperature for Methanol-Water Mixtures at High Pressure and Low Temperature, with Application to Titan

Methanol is a potentially important impurity in subsurface oceans on Titan and Enceladus. We report measurements of the freezing of methanol-water samples at pressures up to 350~MPa using a volumetric cell with sapphire windows. For low concentrations of methanol, the liquidus temperature is typically a few degrees below the corresponding ice freezing point, while at high concentrations it follows the pure methanol trend. In the Ice-III regime, we observe several long-lived metastable states. The results suggest that methanol is a more effective antifreeze than previously estimated, and might have played an important role in the development of Titan's subsurface ocean.

astro-ph.EP

Beam Position Monitor Electronics Upgrade for Fermilab Switchyard

The beam position monitor (BPM) system for Fermilab Switchyard (SY) provides the position, intensity and integrated intensity of the 53.10348 MHz RF bunched resonant extracted beam from the Main Injector over 4 seconds of spill. The total beam intensity varies from 1x10^11 to 1x10^13 protons. The spill is measured by stripline beam postion monitors and resonant circuit. The BPMs have an external resonant circuit tuned to 53.10348 MHz. The corresponding voltage signal out of the BPM has been estimated to be between -110 dBm and -80 dBm.

physics.acc-ph

A gap clearing kicker for Main Injector

Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.

physics.acc-ph