SearcharxivSearch

arXiv subjects

D. Rees

Publications and source records attributed to D. Rees.

3 recordsLinked to original sources

Antiferromagnetic resonance and terahertz continuum in $\alpha-$RuCl$_3$

We report measurements of optical absorption in the zig-zag antiferromagnet $\alpha$-RuCl$_3$ as a function of temperature, $T$, magnetic field, $B$, and photon energy, $\hbar\omega$ in the range $\sim$ 0.3 to 8.3 meV, using time-domain terahertz spectroscopy. Polarized measurements show that 3-fold rotational symmetry is broken in the honeycomb plane from 2 K to 300 K. We find a sharp absorption peak at 2.56 meV upon cooling below the N\'eel temperature of 7 K at $B=0$ that we identify as magnetic-dipole excitation of a zero-wavevector magnon, or antiferromagnetic resonance (AFMR). With application of $B$, the AFMR broadens and shifts to lower frequency as long-range magnetic order is lost in a manner consistent with transitioning to a spin-disordered phase. From direct, internally calibrated measurement of the AFMR spectral weight, we place an upper bound on the contribution to the $dc$ susceptibility from a magnetic excitation continuum.

cond-mat.str-el

High-power Circulator Test Results at 350 MHz and 700 MHz

The high-power RF systems for the Accelerator Production of Tritium (APT) program require high-power circulators at 350 MHz and 700 MHz to protect 1 MW Continuous Wave (CW) klystrons from reflected power. The 350 MHz circulator is based on the CERN, ESRF, and APS designs and has performed very well. The 700 MHz circulator is a new design. Prototype 700 MHz circulators have been high-power tested at Los Alamos National Laboratory (LANL). The first of these circulators has satisfied performance requirements. The circulator requirements, results from the testing, and lessons learned from this development are presented and discussed.

physics.acc-ph

Collector Failures on 350 MHz, 1.2 MW CW Klystrons at the Low Energy Demonstration Accelerator (LEDA)

We are currently operating the front end of the accelerator production of tritium (APT) accelerator, a 7 MeV radio frequency quadrapole (RFQ) using three, 1.2 MW CW klystrons. These klystrons are required and designed to dissipate the full beam power in the collector. The klystrons have less than 1500 operational hours. One collector has failed and all collectors are damaged. This paper will discuss the damage and the difficulties in diagnosing the cause. The collector did not critically fail. Tube operation was still possible and the klystron operated up to 70% of full beam power with excellent vacuum. The indication that finally led us to the collector failure was variable emission. This information will be discussed. A hydrophonic system was implemented to diagnose collector heating. The collectors are designed to allow for mixed-phase cooling and with the hydrophonic test equipment we are able to observe: normal, single-phase cooling, mixed-phase cooling, and a hard boil. These data will be presented. The worst case beam profile from a collector heating standpoint is presented. The paper will also discuss the steps taken to halt the collector damage on the remaining 350 MHz klystrons and design changes that are being implemented to correct the problem.

physics.acc-ph