SearcharxivSearch

arXiv subjects

D. Schulte

Publications and source records attributed to D. Schulte.

At least 19 recordsLinked to original sources

Comparative evaluation of future collider options

In anticipation of the completion of the High-Luminosity Large Hadron Collider (HL-LHC) programme by the end of 2041, CERN is preparing to launch a new major facility in the mid-2040s. According to the 2020 update of the European Strategy for Particle Physics (ESPP), the highest-priority next collider is an electron-positron Higgs factory, followed in the longer term by a hadron-hadron collider at the highest achievable energy. The CERN directorate established a Future Colliders Comparative Evaluation working group in June 2023. This group brings together project leaders and domain experts to conduct a consistent evaluation of the Future Circular Collider (FCC) and alternative scenarios based on shared assumptions and standardized criteria. This report presents a comparative evaluation of proposed future collider projects submitted as input for the Update of the European Strategy for Particle Physics. These proposals are compared considering main performance parameters, environmental impact and sustainability, technical maturity, cost of construction and operation, required human resources, and realistic implementation timelines. An overview of the international collider projects within a similar timeframe, notably the CEPC in China and the ILC in Japan is also presented, as well as a short review of the status and prospects of new accelerator techniques.

physics.acc-ph

Design, construction and commissioning of a high-flow radon removal system for XENONnT

A high-flow radon removal system based on cryogenic distillation was developed and constructed to reduce radon-induced backgrounds in liquid xenon detectors for rare event searches such as XENONnT. A continuous purification of the XENONnT liquid xenon inventory of 8.4 tonnes at process flows up to 71 kg/h (200 slpm) is required to achieve a radon reduction by a factor two for radon sources inside the detector. To reach such high flows, the distillation column's design features liquid xenon inlet and outlets along with novel custom-made bath-type heat exchangers with high liquefaction capabilities. The distillation process was designed using a modification of the McCabe-Thiele approach without a bottom product extraction. The thermodynamic concept is based on a Clausius-Rankine cooling cycle with phase-changing medium, in this case the xenon itself. To drastically reduce the external cooling power requirements, an energy efficient heat pump concept was developed applying a custom-made four cylinder magnetically-coupled piston pump as compressor. The distillation system was operated at thermodynamically stable conditions at a process flow of (91$\pm$2) kg/h ((258$\pm$6) slpm), 30 % over design. With this flow, a $^{222}$Rn activity concentration <1 $μ$Bq/kg is expected inside the XENONnT detector given the measured radon source distribution.

physics.ins-det

The CLIC project

The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e$^+$e$^-$-collider under development by the CLIC accelerator collaboration, hosted by CERN. The CLIC accelerator has been optimised for three energy stages at centre-of-mass energies 380 GeV, 1.5 TeV and 3 TeV. CLIC uses a novel two-beam acceleration technique, with normal-conducting accelerating structures operating in the range of 70-100 MV/m. The report describes recent achievements in accelerator design, technology development and prototyping, system tests and beam tests. Large-scale CLIC-specific beam tests have taken place, for example, at the CLIC Test Facility CTF3 at CERN, at the Accelerator Test Facility ATF2 at KEK, at the FACET facility at SLAC and at the FERMI facility in Trieste. Together, they demonstrate that all implications of the CLIC design parameters are well understood and reproducible in beam tests and prove that the CLIC performance goals are realistic. The implementation of CLIC near CERN has been investigated. Focusing on a staged approach starting at 380 GeV, this includes civil engineering aspects, electrical networks, cooling and ventilation and installation scheduling, transport. All CLIC studies have put emphasis on optimising cost and energy efficiency, and the resulting power and cost estimates are reported. The report follows very closely the accelerator project description in the CLIC Summary Report for the European Particle Physics Strategy update 2018-19. Detailed studies of the physics potential and detector for CLIC, and R&D on detector technologies, have been carried out by the CLIC detector and physics (CLICdp) collaboration. CLIC provides excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.

physics.acc-ph

A Work Proposal for a Collaborative Study of Magnet Technology for a Future Muon Collider

In this paper we elaborate on the nature and challenges for the magnet systems of a muon collider as presently considered within the scope of the International Muon Collider Collaboration (IMCC). We outline the structure of the work proposed over the coming period of five years to study and demonstrate relevant magnet technology. The proposal, which is part of the overall work planned to establish feasibility of a muon collider, is in direct response to the recent recommendations received from the Laboratories Directors Group (LDG). The plan is to profit from joint activities, within the scope of the IMCC and beyond, implemented through direct and EU-funded contributions.

physics.acc-ph

Future Circular Hadron Collider FCC-hh: Overview and Status

The Future Circular Collider (FCC) study was launched as a world-wide international collaboration hosted by CERN. Its goal is to push the field to the next energy frontier beyond LHC, increasing by an order of magnitude the mass of particles that could be directly produced, and decreasing by an order of magnitude the subatomic distances to be studied. The FCC study covers two accelerators, namely, an energy-frontier hadron collider (FCC-hh) and a highest luminosity, high-energy lepton collider (FCC-ee). Both rings are hosted in the same 100 km tunnel infrastructure, replicating the CERN strategy for LEP and LHC, i.e. developing a lepton and a hadron ring sharing the same tunnel. This paper is devoted to the FCC-hh and summarizes the key features of the FCC-hh accelerator design, performance reach, and underlying technologies. The material presented in this paper builds on the conceptual design report published in 2019, and extends it, including also the progress made and the results achieved since then.

physics.acc-ph

A Muon Collider Facility for Physics Discovery

Muon colliders provide a unique route to deliver high energy collisions that enable discovery searches and precision measurements to extend our understanding of the fundamental laws of physics. The muon collider design aims to deliver physics reach at the highest energies with costs, power consumption and on a time scale that may prove favorable relative to other proposed facilities. In this context, a new international collaboration has formed to further extend the design concepts and performance studies of such a machine. This effort is focused on delivering the elements of a $\sim$10 TeV center of mass (CM) energy design to explore the physics energy frontier. The path to such a machine may pass through lower energy options. Currently a 3 TeV CM stage is considered. Other energy stages could also be explored, e.g. an s-channel Higgs Factory operating at 125 GeV CM. We describe the status of the R&D and design effort towards such a machine and lay out a plan to bring these concepts to maturity as a tool for the high energy physics community.

physics.acc-ph

Cryogenic bath-type heat exchangers for ultra-pure noble gas applications

Two cryogenic bath-type heat exchangers for ultra-pure noble gas applications were developed with particular emphasis on noble gas liquefaction in cryogenic distillation systems. The main objective was to construct heat exchangers for xenon from materials that do not emanate radon and that fulfill ultra-high vacuum standards. Therefore, only high-quality copper and stainless steel materials were used. Especially, large-area oxygen-free copper fins with high conductivity in a new design ensure efficient heat transfer. One bath-type Xe-Xe heat exchanger was designed with a diameter of 50 cm to achieve a xenon condensing capacity of at least 100 kg/h. In order to guarantee the necessary heat transfer between the two xenon reservoirs, this heat exchanger features a specially manufactured stainless steel flange with a copper plate welded inside. We first tested our concept on a dedicated bath-type heat exchanger with a reduced diameter of 30 cm using liquid nitrogen to liquefy the xenon. A model based on conservative assumptions such as film boiling on the nitrogen side and film condensation on the xenon side was developed and applied to caluclate the expected heat transfer for our design. We were able to demonstrate an adjustable xenon liquefaction rate of up to 113 kg/h limited only by our measurement procedure at a cooling efficiency of $(0.98\pm 0.03)$ for the LN$_2$-Xe heat exchanger.

physics.ins-det

Ultra-clean radon-free four cylinder magnetically-coupled piston pump

A high performance gas displacement pump based on four individual cylinders was developed. The magnetically-coupled pistons and the hermetically-sealed housings as well as the special cleanliness in terms of out-gassing and radio-purity make the four cylinder pump interesting for the usage in low background experiments dealing with noble gases as target. An optimized inner flow path as well as reduced dead volume with respect to the prototype single cylinder pump of the XENON1T experiment combined with advanced polymer piston gaskets and a piston coupling force of (3177 $\pm$ 162) N ensures a high and reliable performance. Furthermore, a phase-shifted synchronization of the pistons' movement creates an additional performance boost as well as minimizes fluctuations of flow and compression. The pump is able to generate xenon flows of 474 slpm at a pressure difference of 1.80 bar.

physics.ins-det

Reflectivity of VUV-sensitive Silicon Photomultipliers in Liquid Xenon

Silicon photomultipliers are regarded as a very promising technology for next-generation, cutting-edge detectors for low-background experiments in particle physics. This work presents systematic reflectivity studies of Silicon Photomultipliers (SiPM) and other samples in liquid xenon at vacuum ultraviolet (VUV) wavelengths. A dedicated setup at the University of Münster has been used that allows to acquire angle-resolved reflection measurements of various samples immersed in liquid xenon with 0.45° angular resolution. Four samples are investigated in this work: one Hamamatsu VUV4 SiPM, one FBK VUV-HD SiPM, one FBK wafer sample and one Large-Area Avalanche Photodiode (LA-APD) from EXO-200. The reflectivity is determined to be 25-36% at an angle of incidence of 20° for the four samples and increases to up to 65% at 70° for the LA-APD and the FBK samples. The Hamamatsu VUV4 SiPM shows a decline with increasing angle of incidence. The reflectivity results will be incorporated in upcoming light response simulations of the nEXO detector.

physics.ins-det

Surrogate Modeling of the CLIC Final-Focus System using Artificial Neural Networks

Artificial neural networks can be used for creating surrogate models that can replace computationally expensive simulations. In this paper, a surrogate model was created for a subset of the Compact Linear Collider (CLIC) final-focus system. By training on simulation data, we created a model that maps sextupole offsets to luminosity and beam sizes, thus replacing computationally intensive tracking and beam-beam simulations. This model was then used for optimizing the parameters of a random walk procedure for sextupole alignment.

physics.acc-ph

A primary electron beam facility at CERN -- eSPS Conceptual design report

The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastructure. The facility would be relevant for several of the key priorities in the 2020 update of the European Strategy for Particle Physics, such as an electron-positron Higgs factory, accelerator R\&D, dark sector physics, and neutrino physics. In addition, it could serve experiments in nuclear physics. The electron beam delivered by this facility would provide access to light dark matter production significantly beyond the targets predicted by a thermal dark matter origin, and for natures of dark matter particles that are not accessible by direct detection experiments. It would also enable electro-nuclear measurements crucial for precise modelling the energy dependence of neutrino-nucleus interactions, which is needed to precisely measure neutrino oscillations as a function of energy. The implementation of the facility is the natural next step in the development of X-band high-gradient acceleration technology, a key technology for compact and cost-effective electron/positron linacs. It would also become the only facility with multi-GeV drive bunches and truly independent electron witness bunches for plasma wakefield acceleration. A second phase capable to deliver positron witness bunches would make it a complete facility for plasma wakefield collider studies. [...]

physics.acc-ph

Measurements of sub-nT dynamic magnetic field shielding with soft iron and mu-metal for use in linear colliders

There is an increasing need to shield beams and accelerator elements from stray magnetic fields. The application of magnetic shielding in linear colliders is discussed. The shielding performance of soft iron and mu-metal is measured for magnetic fields of varying amplitude and frequency. Special attention is given to characterise the shielding performance for very small-amplitude magnetic fields.

physics.acc-ph

Measurements and modelling of stray magnetic fields and the simulation of their impact on the Compact Linear Collider at 380 GeV

The Compact Linear Collider (CLIC) targets a nanometre beam size at the collision point. Realising this beam size requires the generation and transport of ultra-low emittance beams. Dynamic imperfections can deflect the colliding beams, leading to a collision with a relative offset. They can also degrade the emittance of each beam. Both of these effects can significantly impact the luminosity of CLIC. In this paper, we examine a newly considered dynamic imperfection: stray magnetic fields. Measurements of stray magnetic fields in the Large Hadron Collider tunnel are presented and used to develop a statistical model that can be used to realistically generate stray magnetic fields in simulations. The model is used in integrated simulations of CLIC at 380GeV including mitigation systems for stray magnetic fields to evaluate their impact on luminosity.

physics.acc-ph

Sensitivity of the DARWIN observatory to the neutrinoless double beta decay of $^{136}$Xe

The DARWIN observatory is a proposed next-generation experiment to search for particle dark matter and for the neutrinoless double beta decay of $^{136}$Xe. Out of its 50$\,$t total natural xenon inventory, 40$\,$t will be the active target of a time projection chamber which thus contains about 3.6 t of $^{136}$Xe. Here, we show that its projected half-life sensitivity is $2.4\times10^{27}\,$yr, using a fiducial volume of 5t of natural xenon and 10$\,$yr of operation with a background rate of less than 0.2$~$events/(t$\cdot$yr) in the energy region of interest. This sensitivity is based on a detailed Monte Carlo simulation study of the background and event topologies in the large, homogeneous target. DARWIN will be comparable in its science reach to dedicated double beta decay experiments using xenon enriched in $^{136}$Xe.

physics.ins-det

Luminosity Performance of the Compact Linear Collider at 380 GeV with Static and Dynamic Imperfections

The Compact Linear Collider is one of the two main European options for a collider in a post Large Hadron Collider era. This is a linear $e^+e^-$ collider with three centre-of-mass energy stages: 380 GeV, 1.5 TeV and 3 TeV. The luminosity performance of the first stage at 380 GeV is presented including the impact of static and dynamic imperfections. These calculations are performed with fully realistic tracking simulations from the exit of the damping rings to the interaction point and including beam-beam effects in the collisions. A luminosity of $4.3\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$ can be achieved with a perfect collider, which is almost three times the nominal luminosity target of $1.5\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$. In simulations with static imperfections, a luminosity of $2.35\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$ or greater is achieved by 90% of randomly misaligned colliders. Expressed as a percentage of the nominal luminosity target, this is a surplus of approximately 57%. Including the impact of ground motion, a luminosity surplus of 53% or greater can be expected for 90% of colliders. The average expected luminosity is $2.8\times10^{34}~\text{cm}^{-2}\text{s}^{-1}$, which is almost twice the nominal luminosity target.

physics.acc-ph

Top-Quark Physics at the CLIC Electron-Positron Linear Collider

The Compact Linear Collider (CLIC) is a proposed future high-luminosity linear electron-positron collider operating at three energy stages, with nominal centre-of-mass energies: 380 GeV, 1.5 TeV, and 3 TeV. Its aim is to explore the energy frontier, providing sensitivity to physics beyond the Standard Model (BSM) and precision measurements of Standard Model processes with an emphasis on Higgs boson and top-quark physics. The opportunities for top-quark physics at CLIC are discussed in this paper. The initial stage of operation focuses on top-quark pair production measurements, as well as the search for rare flavour-changing neutral current (FCNC) top-quark decays. It also includes a top-quark pair production threshold scan around 350 GeV which provides a precise measurement of the top-quark mass in a well-defined theoretical framework. At the higher-energy stages, studies are made of top-quark pairs produced in association with other particles. A study of ttH production including the extraction of the top Yukawa coupling is presented as well as a study of vector boson fusion (VBF) production, which gives direct access to high-energy electroweak interactions. Operation above 1 TeV leads to more highly collimated jet environments where dedicated methods are used to analyse the jet constituents. These techniques enable studies of the top-quark pair production, and hence the sensitivity to BSM physics, to be extended to higher energies. This paper also includes phenomenological interpretations that may be performed using the results from the extensive top-quark physics programme at CLIC.

hep-ex

The Compact Linear Collider (CLIC) - Project Implementation Plan

The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development by international collaborations hosted by CERN. This document provides an overview of the design, technology, and implementation aspects of the CLIC accelerator. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, for a site length ranging between 11 km and 50 km. CLIC uses a Two-Beam acceleration scheme, in which normal-conducting high-gradient 12 GHz accelerating structures are powered via a high-current Drive Beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments, and system tests have resulted insignificant progress in recent years. Moreover, this has led to an increased energy efficiency and reduced power consumption of around 170 MW for the 380 GeV stage, together with a reduced cost estimate of approximately 6 billion CHF. The construction of the first CLIC energy stage could start as early as 2026 and first beams would be available by 2035, marking the beginning of a physics programme spanning 25-30 years and providing excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.

physics.acc-ph