SearcharxivSearch

arXiv subjects

D. Valuch

Publications and source records attributed to D. Valuch.

6 recordsLinked to original sources

Environmental Measurements in the Sedrun Access Shaft to the Gotthard Base Tunnel -- a Promising Site for a Long-Baseline Atom Interferometer

Atom interferometer (AI) experiments offer interesting prospects for searches for the interactions of ultralight bosonic dark matter with Standard Model particles as well as detection of gravitational waves in a frequency band inaccessible to experiments that are operating or under construction. Ideal locations for the next generation of such experiments are provided by long vertical shafts, such as that providing access to the Gotthard base railway tunnel from the Sedrun locality in the Canton Grisons of Switzerland. We present the results of an exploratory environmental measurement campaign at this location to evaluate the ground motion activity and the background electromagnetic field quality. We find that the backgrounds due to both ground motion and electromagnetic fields, including those due to passing trains, are low enough for successful operation of a 800-m AI experiment.

physics.atom-ph

A Long-Baseline Atom Interferometer at CERN: Conceptual Feasibility Study

We present results from exploratory studies, supported by the Physics Beyond Colliders (PBC) Study Group, of the suitability of a CERN site and its infrastructure for hosting a vertical atom interferometer (AI) with a baseline of about 100 m. We first review the scientific motivations for such an experiment to search for ultralight dark matter and measure gravitational waves, and then outline the general technical requirements for such an atom interferometer, using the AION-100 project as an example. We present a possible CERN site in the PX46 access shaft to the Large Hadron Collider (LHC), including the motivations for this choice and a description of its infrastructure. We then assess its compliance with the technical requirements of such an experiment and what upgrades may be needed. We analyse issues related to the proximity of the LHC machine and its ancillary hardware and present a preliminary safety analysis and the required mitigation measures and infrastructure modifications. In conclusion, we identify primary cost drivers and describe constraints on the experimental installation and operation schedules arising from LHC operation. We find no technical obstacles: the CERN site is a very promising location for an AI experiment with a vertical baseline of about 100 m.

physics.atom-ph

Proof-of-principle direct measurement of Landau damping strength at the Large Hadron Collider with an anti-damper

Landau damping is an essential mechanism for ensuring collective beam stability in particle accelerators. Precise knowledge of how strong Landau damping is, is key to making accurate predictions on beam stability for state-of-the-art high energy colliders. In this paper we demonstrate an experimental procedure that would allow quantifying the strength of Landau damping and the limits of beam stability using an active transverse feedback as a controllable source of beam coupling impedance. In a proof-of-principle test performed at the Large Hadron Collider stability diagrams for a range of Landau Octupole strengths have been measured. In the future, the procedure could become an accurate way of measuring stability diagrams throughout the machine cycle.

physics.acc-ph

Testing Beam-Induced Quench Levels of LHC Superconducting Magnets

In the years 2009-2013 the Large Hadron Collider (LHC) has been operated with the top beam energies of 3.5 TeV and 4 TeV per proton (from 2012) instead of the nominal 7 TeV. The currents in the superconducting magnets were reduced accordingly. To date only seventeen beam-induced quenches have occurred; eight of them during specially designed quench tests, the others during injection. There has not been a single beam- induced quench during normal collider operation with stored beam. The conditions, however, are expected to become much more challenging after the long LHC shutdown. The magnets will be operating at near nominal currents, and in the presence of high energy and high intensity beams with a stored energy of up to 362 MJ per beam. In this paper we summarize our efforts to understand the quench levels of LHC superconducting magnets. We describe beam-loss events and dedicated experiments with beam, as well as the simulation methods used to reproduce the observable signals. The simulated energy deposition in the coils is compared to the quench levels predicted by electro-thermal models, thus allowing to validate and improve the models which are used to set beam-dump thresholds on beam-loss monitors for Run 2.

physics.acc-ph

The Tuning System for the HIE-ISOLDE High-Beta Quarter Wave Resonator

A new linac using superconducting quarter-wave resonators (QWR) is under construction at CERN in the framework of the HIE-ISOLDE project. The QWRs are made of niobium sputtered on a bulk copper substrate. The working frequency at 4.5 K is 101.28 MHz and they will provide 6 MV/m accelerating gradient on the beam axis with a total maximum power dissipation of 10 W on cavity walls. A tuning system is required in order to both minimize the forward power variation in beam operation and to compensate the unavoidable uncertainties in the frequency shift during the cool-down process. The tuning system has to fulfil a complex combination of RF, structural and thermal requirements. The paper presents the functional specifications and details the tuning system RF and mechanical design and simulations. The results of the tests performed on a prototype system are discussed and the industrialization strategy is presented in view of final production.

physics.acc-ph

Synchronous Phase Shift at LHC

The electron cloud in vacuum pipes of accelerators of positively charged particle beams causes a beam energy loss which could be estimated from the synchronous phase. Measurements done with beams of 75 ns, 50 ns, and 25 ns bunch spacing in the LHC for some fills in 2010 and 2011 show that the average energy loss depends on the total beam intensity in the ring. Later measurements during the scrubbing run with 50 ns beams show the reduction of the electron cloud due to scrubbing. Finally, measurements of the individual bunch phase give us information about the electron cloud build-up inside the batch and from batch to batch.

physics.acc-ph