Searcharxiv⌕ Search

arXiv subjects

Daijiafan Mao

Publications and source records attributed to Daijiafan Mao.

3 recordsLinked to original sources

Location Planning of Fast Charging Station considering its Impact on the Power Grid Assets

Under the ambition of boosting Plug-in Electric Vehicle (PEV) charging speed to a level comparable to the traditional refueling, Fast Charging Station (FCS) has been integrated into power distribution system. The location planning of FCS must allow for satisfactory charging service for PEV users as well as mitigate the detrimental effects on power grid caused by uncertainty and impulsiveness of charging demand. This paper proposed a location planning model for FCS, taking into account its impacts on the critical power grid assets. The multi-objective planning model simultaneously considered the role of FCS in the electricity and transportation sectors. This planning model is solved by the cross-entropy (CE) method. The validity and effectiveness of the CE approach have been demonstrated on a synthetic coupled network.

math.OC↗

Evaluating PEV Impact on Long-Term Cost of Grid Assets

With increasing penetration and improving fast charging technologies, Plug-in Electric Vehicles (PEV) exert a disruptive influence on power delivery systems. The impulsive and high power-density characteristics of PEV make conventional assessment methods of load impact unsuitable. This paper proposes an integrated method to investigate the long-term impact of PEV charging on temporal response and depreciation of grid assets in sub-transmission and distribution grid levels (below 69kV). Compared to conventional methods, the proposed method embeds dynamical system models of grid assets in Time-Series (TS) analysis and captures stochastic charging behavior through Monte-Carlo simulation, promising more robust and accurate assessment. Under the proposed method, the Total Cost of Ownership (TCO) of grid assets formulation is re-established. The results of this paper will enable utilities to quantify the capital and operation cost of grid assets induced under various PEV penetration level and during any time span of interest.

eess.SP↗

The Impact of Power-Electronics-Based Load Dynamics on Large-disturbance Voltage Stability

This paper establishes a new context where the power-electronics-based (PE-based) load, represented by Plug-in Electric Vehicles, dominates the total load composition in power systems. The inherent fast dynamics of PE-based load make conventional approaches of voltage stability analysis unsuitable. Under the new context, the mechanism and impacts of voltage instability under large disturbances have been analytically revealed. The Region of Attraction (ROA) of the stable equilibrium point has been estimated through nonlinear dynamical system theories, which implies a critical clearing time post grid disturbance.

eess.SP↗