SearcharxivSearch

arXiv subjects

Damien Lafarge

Publications and source records attributed to Damien Lafarge.

2 recordsLinked to original sources

Technical Proposal for the Atom Interferometer CERN Experiment (AICE) Facility

We present the technical proposal for the Atom Interferometer CERN Experiment (AICE), a $\mathcal{O}(100)$ m vertical atom interferometer to be installed against the wall of the PX46 access shaft to the LHC. AICE is conceived as a versatile and flexible long-baseline atom-interferometry facility whose primary scientific goal is probing for bosonic ultralight dark matter (ULDM) in a mass range inaccessible to other experiments, with a secondary goal of pioneering the exploration of gravitational waves (GWs) with frequencies in the range ${\sim}$0.03-3 Hz as a pathfinder for future longer-baseline detectors. The initial configuration employs ultracold $^{87}$Sr atoms in a single-photon 698-nm interferometer with three shaft-based atom sources in a multi-source gradiometer geometry, supported by one surface reference source for laser stabilisation and diagnostics, to target scalar ULDM. Operation with $^{88}$Sr will give sensitivity to axion-like particles (ALPs), vector ULDM with $B-L$ couplings and violation of the principle of equivalence, while a $^{171}$Yb upgrade will improve the sensitivity to $B-L$ couplings and equivalence violations. Probing the Einstein equivalence principle (EP) and measuring $α$ will proceed in parallel with the ULDM searches. A conceptual feasibility study and a detailed technical implementation study have established that PX46 is a uniquely mature and implementation-ready site, with no technical showstoppers. Completing site preparation works during LS3 would enable the subsequent installation and operation of AICE without impacting HL-LHC operations. The detector design builds on the VLBAI and MAGIS experiments and the AION-10 Technical Design Report, scaling the strontium gradiometer architecture to the $\sim$100 m baseline. AICE is endorsed by the TVLBAI Proto-Collaboration, comprising 57 institutions in 22 countries.

hep-ex

Study of alternative locations for the SPS Beam Dump Facility

As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of existing facilities with the aim of significantly reducing the costs of the facility. Building on the BDF/SHiP Comprehensive Design Study (CDS), the assessment rests on the generic requirements and constraints that allow preserving the physics reach of the facility by making use of the $4\times 10^{19}$ protons per year at 400\,GeV that are currently not exploited at the SPS and for which no existing facility is compatible. The options considered involve the underground areas TCC4, TNC, and ECN3. Recent improvements of the BDF design at the current location (referred to as `TT90-TCC9-ECN4') are also mentioned together with ideas for yet further improvements. The assessments of the alternative locations compiled the large amount of information that is already available together with a set of conceptual studies that were performed during 2021. The document concludes with a qualitative comparison of the options, summarising the associated benefits and challenges of each option, such that a recommendation can be made about which location is to be pursued. The most critical location-specific studies required to specify the implementation and cost for each option are identified so that the detailed investigation of the retained option can be completed before the end of 2022.

physics.acc-ph