SearcharxivSearch

arXiv subjects

Danny Hermelin

Publications and source records attributed to Danny Hermelin.

At least 19 recordsLinked to original sources

Approximate Total Weighted Completion Time with Convex Controllable Processing Times

We study the single-machine scheduling problem with controllable processing times to minimize the total weighted completion time, focusing on the setting where a job's processing time is a convex function of its allocated continuous resource. The computational complexity of this problem represents a long-standing open question, as it is currently neither known to be polynomial-time solvable nor NP-hard. While we do not fully resolve this complexity question, we provide several insights into the problem's approximability. On the positive side, we present a polynomial-time $e \le 2.719$-approximation algorithm, alongside a quasi-polynomial approximation scheme for instances where the largest parameter value is polynomially bounded by the instance size. On the negative side, we demonstrate that simple sorting rules, which are optimal for certain special cases in the literature, cannot guarantee a constant-factor approximation for the general case.

cs.DS

Lawler-Moore Speedups via Additive Combinatorics

The Lawler-Moore dynamic programming framework is a classical tool in scheduling on parallel machines. It applies when the objective is regular, i.e. monotone in job completion times, and each machine follows a fixed priority order such as Smith's Rule or Jackson's Rule. For the basic objectives $Pm||\sum w_jC_j$, $Pm||L_{\max}$, and $Pm||\sum w_jU_j$, it gives running times $O(P^{m-1}n)$, $O(P^{m-1}n)$, and $O(P^mn)$, respectively, where $P$ is the total processing time. Recent SETH-based lower bounds indicate that the dependence on $P$ is essentially optimal, but they do not rule out improved dependence on the maximum processing time $p_{\max}$. We give the first major speedup of the Lawler-Moore recurrence. Our main ingredients are a new state-pruning method and a swapping argument based on an additive-combinatorial lemma. We prove that, whenever this swap does not increase the objective value, there exists an optimal schedule in which, for every prefix of jobs, the load difference between any two machines is at most $4p_{\max}^2$. This lets us prune redundant states throughout the dynamic program, replacing the dependence on $P$ by a dependence on $p_{\max}^2$. We show that the swap is non-increasing for all three objectives above. Hence $Pm||\sum w_jC_j$ and $Pm||L_{\max}$ admit algorithms with running time $O(p_{\max}^{2m-2}n)$, while $Pm||\sum w_jU_j$ can be solved in time $O(p_{\max}^{2m-2}Pn)\le O(p_{\max}^{2m-1}n^2)$. These bounds strictly improve the original Lawler-Moore runtimes whenever $p_{\max}=o(\sqrt{P})$. In particular, for $Pm||\sum w_jC_j$ and $Pm||L_{\max}$, we obtain the first near-linear-time algorithms when processing times are polylogarithmic in $n$.

cs.DS

Robust Permutation Flowshops Under Budgeted Uncertainty

We consider the robust permutation flowshop problem under the budgeted uncertainty model, where at most a given number of job processing times may deviate on each machine. We show that solutions for this problem can be determined by solving polynomially many instances of the corresponding nominal problem. As a direct consequence, our result implies that this robust flowshop problem can be solved in polynomial time for two machines, and can be approximated in polynomial time for any fixed number of machines. The reduction that is our main result follows from an analysis similar to Bertsimas and Sim (2003) except that dualization is applied to the terms of a min-max objective rather than to a linear objective function. Our result may be surprising considering that heuristic and exact integer programming based methods have been developed in the literature for solving the two-machine flowshop problem. Next, we show a logarithmic factor improvement in the overall running time implied by a naive reduction to nominal problems in the case of two machines and three machines. We conclude by noting that our reduction appears to have more general consequences for robust optimization problems under budgeted uncertainty having a similar form.

cs.DS

Fast Makespan Minimization via Short ILPs

Short integer linear programs are programs with a relatively small number of constraints. We show how recent improvements on the running-times of solvers for such programs can be used to obtain fast pseudo-polynomial time algorithms for makespan minimization on a fixed number of parallel machines, and other related variants. The running times of our algorithms are all of the form $\widetilde{O}(p^{O(1)}_{\max}+n)$ or $\widetilde{O}(p^{O(1)}_{\max} \cdot n)$, where $p_{\max}$ is the maximum processing time in the input. These improve upon the time complexity of previously known algorithms for moderate values of $p_{\max}$.

cs.DS

Approximation Algorithms for Fair Repetitive Scheduling

We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job processing permutation for each day, aiming to minimize the maximum total completion time experienced by any client. This problem is known to be NP-hard for quite restrictive settings, with previous work offering exact solution methods for highly-structured special cases. In this paper, we focus on the design of approximation algorithms with provable performance guarantees. Our main contributions can be briefly summarized as follows: (i) When job processing times are day-dependent, we devise a polynomial-time LP-based $2$-approximation, as well as a polynomial-time approximation scheme for a constant number of days. (ii) With day-invariant processing times, we obtain a surprisingly simple $(\frac{1+\sqrt{2}}{2}+\epsilon)$-approximation in polynomial time. This setting is also shown to admit a quasi-polynomial-time approximation scheme for an arbitrary number of days. The key technical component driving our approximation schemes is a novel batching technique, where jobs are conceptually grouped into batches, subsequently leading either to a low-dimensional dynamic program or to a compact configuration LP. Concurrently, while developing our constant-factor approximations, we propose a host of lower-bounding mechanisms that may be of broader interest.

cs.DS

Concurrency Constrained Scheduling with Tree-Like Constraints

This paper investigates concurrency-constrained scheduling problems, where the objective is to construct a schedule for a set of jobs subject to concurrency restrictions. Formally, we are given a conflict graph $G$ defined over a set of $n$ jobs, where an edge between two jobs in $G$ indicates that these jobs cannot be executed concurrently. Each job may have distinct attributes, such as processing time, due date, weight, and release time. The goal is to determine a schedule that optimizes a specified scheduling criterion while adhering to all concurrency constraints. This framework offers a versatile model for analyzing resource allocation problems where processes compete for shared resources, such as access to shared memory. From a theoretical perspective, it encompasses several classical graph coloring problems, including Chromatic Number, Sum Coloring, and Interval Chromatic Number. Given that even the simplest concurrency-constrained scheduling problems are NP-hard for general conflict graphs, this study focuses on conflict graphs with bounded treewidth. Our results establish a dichotomy: Some problems in this setting can be solved in FPT time, while others are shown to be XALP-complete for treewidth as parameter. Along the way, we generalize several previously known results on coloring problems for bounded treewidth graphs. Several of the FPT algorithms are based on the insight that completion times are bounded by the Grundy number of the conflict graph - the fact that this number is bounded by the product of treewidth and the logarithm of the number of vertices then leads to the FPT time bound.

cs.DM

Faster Minimization of Total Weighted Completion Time on Parallel Machines

We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This problem is well known to be NP-hard, but only in the ordinary sense, and appears as one of the fundamental problems in any scheduling textbook. In particular, the problem served as a proof of concept for applying pseudo-polynomial time algorithms and approximation schemes to scheduling problems. The fastest known pseudo-polynomial time algorithm for $Pm||\sum w_jC_j$ is the famous Lawler and Moore algorithm from the late 1960's which runs in $\tilde{O}(P^{m-1}n)$ time, where $P$ is the total processing time of all jobs in the input. After more than 50 years, we are the first to present an algorithm, alternative to that of Lawler and Moore, which is faster for certain range of the problem parameters (e.g., when their values are all $O(1)$).

cs.DS

Fair Repetitive Interval Scheduling

Fair resource allocation is undoubtedly a crucial factor in customer satisfaction in several scheduling scenarios. This is especially apparent in repetitive scheduling models where the same set of clients repeatedly submits jobs on a daily basis. In this paper, we aim to analyze a repetitive scheduling system involving a set of $n$ clients and a set of $m$ days. On every day, each client submits a request to process a job exactly within a specific time interval, which may vary from day to day, modeling the scenario where the scheduling is done Just-In-Time (JIT). The daily schedule is executed on a single machine that can process a single job at a time, therefore it is not possible to schedule jobs with intersecting time intervals. Accordingly, a feasible solution corresponds to sets of jobs with disjoint time intervals, one set per day. We define the quality of service (QoS) that a client receives as the number of executed jobs over the $m$ days period. Our objective is to provide a feasible solution where each client has at least $k$ days where his jobs are processed. We prove that this problem is NP-hard even under various natural restrictions such as identical processing times and day-independent due dates. We also provide efficient algorithms for several special cases and analyze the parameterized tractability of the problem with respect to several parameters, providing both parameterized hardness and tractability results.

cs.DS

Minimizing the Number of Tardy Jobs and Maximal Tardiness on a Single Machine is NP-hard

This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic approach with the maximal tardiness being the primary criterion. Accordingly, the objective is to find, among all solutions minimizing the maximal tardiness, the one which has the minimum number of tardy jobs. The complexity of this problem has been open for over thirty years, and has been known since then to be one of the most challenging open questions in multicriteria scheduling. We resolve this question by proving that the problem is strongly NP-hard. We also prove that the problem is at least weakly NP-hard when we switch roles between the two criteria (i.e., when the number of tardy jobs is the primary criterion). Finally, we provide hardness results for two other approaches (constraint and a priori approaches) to deal with these two criteria.

cs.DS

Minimizing the Weighted Number of Tardy Jobs is W[1]-hard

We consider the $1||\sum w_J U_j$ problem, the problem of minimizing the weighted number of tardy jobs on a single machine. This problem is one of the most basic and fundamental problems in scheduling theory, with several different applications both in theory and practice. We prove that $1||\sum w_J U_j$ is W[1]-hard with respect to the number $p_{\#}$ of different processing times in the input, as well as with respect to the number $w_{\#}$ of different weights in the input. This, along with previous work, provides a complete picture for $1||\sum w_J U_j$ from the perspective of parameterized complexity, as well as almost tight complexity bounds for the problem under the Exponential Time Hypothesis (ETH).

cs.DS

No Polynomial Kernels for Knapsack

This paper focuses on kernelization algorithms for the fundamental Knapsack problem. A kernelization algorithm (or kernel) is a polynomial-time reduction from a problem onto itself, where the output size is bounded by a function of some problem-specific parameter. Such algorithms provide a theoretical model for data reduction and preprocessing and are central in the area of parameterized complexity. In this way, a kernel for Knapsack for some parameter $k$ reduces any instance of Knapsack to an equivalent instance of size at most $f(k)$ in polynomial time, for some computable function $f(\cdot)$. When $f(k)=k^{O(1)}$ then we call such a reduction a polynomial kernel. Our study focuses on two natural parameters for Knapsack: The number of different item weights $w_{\#}$, and the number of different item profits $p_{\#}$. Our main technical contribution is a proof showing that Knapsack does not admit a polynomial kernel for any of these two parameters under standard complexity-theoretic assumptions. Our proof discovers an elaborate application of the standard kernelization lower bound framework, and develops along the way novel ideas that should be useful for other problems as well. We complement our lower bounds by showing the Knapsack admits a polynomial kernel for the combined parameter $w_{\#}+p_{\#}$.

cs.DS

Hardness of Interval Scheduling on Unrelated Machines

We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly at their deadline. We are given $n$ jobs and $m$ machines. Each job has a deadline, a weight, and a processing time that may be different on each machine. The goal is find a schedule that maximized the total weight of jobs completed exactly at their deadline. Note that this uniquely defines a processing time interval for each job on each machine. Interval Scheduling on Unrelated Machines is closely related to coloring interval graphs and has been thoroughly studied for several decades. However, as pointed out by Mnich and van Bevern [Computers \& Operations Research, 2018], the parameterized complexity for the number $m$ of machines as a parameter remained open. We resolve this by showing that Interval Scheduling on Unrelated Machines is W[1]-hard when parameterized by the number $m$ of machines. To this end, we prove W[1]-hardness with respect to $m$ of the special case where we have parallel machines with eligible machine sets for jobs. This answers Open Problem 8 of Mnich and van Bevern's list of 15 open problems in the parameterized complexity of scheduling [Computers \& Operations Research, 2018]. Furthermore, we resolve the computational complexity status of the unweighted version of Interval Scheduling on Unrelated Machines by proving that it is NP-complete. This answers an open question by Sung and Vlach [Journal of Scheduling, 2005].

cs.CC

Minimizing the Weighted Number of Tardy Jobs via (max,+)-Convolutions

The $1 \mid \mid \Sigma w_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs. This is a classical scheduling problem that generalizes both Knapsack, and Subset Sum. The best known pseudo-polynomial algorithm for $1 \mid \mid \Sigma w_j U_j$, due to Lawler and Moore [Management Science'69], dates back to the late 60s and has a running time of $O(d_{\max}n)$, where $n$ is the number of jobs and $d_{\max}$ is their maximal due date. A recent lower bound by Cygan \emph{et al.}~[ICALP'19] for Knapsack shows that $1 \mid \mid \Sigma w_j U_j$ cannot be solved in $\widetilde{O}((n+d_{\max})^{2-\varepsilon})$ time, for any $\varepsilon > 0$, under a plausible conjecture. This still leaves a gap between the best known lower bound and upper bound for the problem. In this paper we design a new simple algorithm for $1 \mid \mid \Sigma w_j U_j$ that uses $(\max,+)$-convolutions as its main tool, and outperforms the Lawler and Moore algorithm under several parameter ranges. In particular, depending on the specific method of computing $(\max,+)$-convolutions, its running time can be bounded by - $\widetilde{O}(n+d_{\#}d_{\max}^2)$. - $\widetilde{O}(d_{\#}n +d^2_{\#}d_{\max}w_{\max})$. - $\widetilde{O}(d_{\#}n +d_{\#}d_{\max}p_{\max})$. - $\widetilde{O}(n^2 +d_{\max}w^2_{\max})$. - $\widetilde{O}(n^2 + d_{\#}(d_{\max}w_{\max})^{1.5})$. Here, $d_{\#}$ denotes the number of \emph{different} due dates in the instance, $p_{\max}$ denotes the maximum processing time of any job, and $w_{\max}$ denotes the maximum weight of any job.

cs.DS

Fairness in Repetitive Scheduling

Recent research found that fairness plays a key role in customer satisfaction. Therefore, many manufacturing and services industries have become aware of the need to treat customers fairly. Still, there is a huge lack of models that enable industries to make operational decisions fairly, such as a fair scheduling of the customers' jobs. Our main aim in this research is to provide a unified framework to enable schedulers making fair decisions in repetitive scheduling environments. For doing so, we consider a set of repetitive scheduling problems involving a set of $n$ clients. In each out of $q$ consecutive operational periods (e.g. days), each one of the customers submits a job for processing by an operational system. The scheduler's aim is to provide a schedule for each of the $q$ periods such that the quality of service (QoS) received by each of the clients will meet a certain predefined threshold. The QoS of a client may take several different forms, e.g., the number of days that the customer receives its job later than a given due-date, the number of times the customer receive his preferred time slot for service, or the sum of waiting times for service. We analyze the single machine variant of the problem for several different definitions of QoS, and classify the complexity of the corresponding problems using the theories of classical and parameterized complexity. We also study the price of fairness, i.e., the loss in the system's efficiency that results from the need to provide fair solutions.

cs.DS

Temporal Interval Cliques and Independent Sets

Temporal graphs have been recently introduced to model changes to a given network that occur throughout a fixed period of time. The Temporal $\Delta$ Clique problem, that generalizes the well known Clique problem to temporal graphs, has been studied in the context of finding nodes of interest in dynamic networks [TCS '16]. We introduce the Temporal $\Delta$ Independent Set problem, a temporal generalization of Independent Set. This problem is e.g. motivated in the context of finding conflict-free schedules for maximum subsets of tasks, that have certain (changing) constraints on each day they need to be performed. We are specifically interested in the case where each task needs to be performed in a certain time-interval on each day and two tasks are in conflict on a certain day if their time-intervals on that day overlap. This leads us to considering both problems on the restricted class of temporal unit interval graphs, i.e., temporal graphs where each layer is a unit interval graph. We present several hardness results as well as positive results. On the algorithmic side, we provide constant-factor approximation algorithms for instances of both problems where $\tau$, the total number of time steps (layers) of the temporal graph, and $\Delta$, a parameter that allows us to model conflict tolerance, are constants. We develop an exact FPT algorithm for Temporal $\Delta$ Clique with respect to parameter $\tau+k$. Finally, we use the notion of order preservation for temporal unit interval graphs that, informally, requires the intervals of every layer to obey a common ordering. For both problems we provide an FPT algorithm parameterized by the size of minimum vertex deletion set to order preservation.

cs.DS

Polynomial Turing Kernels for Clique with an Optimal Number of Queries

A polynomial Turing kernel for some parameterized problem $P$ is a polynomial-time algorithm that solves $P$ using queries to an oracle of $P$ whose sizes are upper-bounded by some polynomial in the parameter. Here the term "polynomial" refers to the bound on the query sizes, as the running time of any kernel is required to be polynomial. One of the most important open goals in parameterized complexity is to understand the applicability and limitations of polynomial Turing Kernels. As any fixed-parameter tractable problem admits a Turing kernel of some size, the focus has mostly being on determining which problems admit such kernels whose query sizes can be indeed bounded by some polynomial. In this paper we take a different approach, and instead focus on the number of queries that a Turing kernel uses, assuming it is restricted to using only polynomial sized queries. Our study focuses on one the main problems studied in parameterized complexity, the Clique problem: Given a graph $G$ and an integer $k$, determine whether there are $k$ pairwise adjacent vertices in $G$. We show that Clique parameterized by several structural parameters exhibits the following phenomena: - It admits polynomial Turing kernels which use a sublinear number of queries, namely $O(n/\log^c n)$ queries where $n$ is the total size of the graph and $c$ is any constant. This holds even for a very restrictive type of Turing kernels which we call OR-kernels. - It does not admit polynomial Turing kernels which use $O(n^{1-\epsilon})$ queries, unless NP$\subseteq$coNP/poly. For proving the second item above, we develop a new framework for bounding the number of queries needed by polynomial Turing kernels. This framework is inspired by the standard lower bounds framework for Karp kernels, and while it is quite similar, it still requires some novel ideas to allow its extension to the Turing setting.

cs.CC

A comparison between D-wave and a classical approximation algorithm and a heuristic for computing the ground state of an Ising spin glass

Finding the ground state of an Ising-spin glass on general graphs belongs to the class of NP-hard problems, widely believed to have no efficient polynomial-time algorithms for solving them. An approach developed in computer science for dealing with such problems is to devise approximation algorithms that run in polynomial time, and provide solutions with provable guarantees on their quality in terms of the optimal unknown solution. Recently, several algorithms for the Ising-spin glass problem on a graph that provide different approximation guarantees were introduced albeit without implementation. Also recently, D-wave company constructed a physical realization of an adiabatic quantum computer, and enabled researchers to access it. D-wave is particularly suited for computing an approximation for the ground state of an Ising spin glass on its chimera graph -- a graph with bounded degree. In this work, we compare the performance of a recently developed approximation algorithm for solving the Ising spin glass problem on graphs of bounded degree against the D-wave computer. We also compared a heuristic tailored specifically to handle the fixed D-wave chimera graph. D-wave computer was able to find better approximations to all the random instances we studied. Furthermore the convergence times of D-wave were also significantly better. These results indicate the merit of D-wave computer under certain specific instances. More broadly, our method is relevant to other performance comparison studies. We suggest that it is important to compare the performance of quantum computers not only against exact classical algorithms with exponential run-time scaling, but also to approximation algorithms with polynomial run-time scaling and a provable guarantee on performance.

cond-mat.dis-nn

Equitable Scheduling on a Single Machine

We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of the problem at once. In particular, we have $n$ clients over a period of $m$ days, where each client has a single job with its own processing time and deadline per day. Our goal is to provide a schedule for each of the $m$ days, so that each client is guaranteed to have their job meet its deadline in at least $k \le m$ days. This corresponds to an equitable schedule where each client is guaranteed a minimal level of service throughout the period of $m$ days. We provide a thorough analysis of the computational complexity of three main variants of this problem, identifying both efficient algorithms and worst-case intractability results.

cs.DM