SearcharxivSearch

arXiv subjects

Dvir Shabtay

Publications and source records attributed to Dvir Shabtay.

At least 19 recordsLinked to original sources

Lawler-Moore Speedups via Additive Combinatorics

The Lawler-Moore dynamic programming framework is a classical tool in scheduling on parallel machines. It applies when the objective is regular, i.e. monotone in job completion times, and each machine follows a fixed priority order such as Smith's Rule or Jackson's Rule. For the basic objectives $Pm||\sum w_jC_j$, $Pm||L_{\max}$, and $Pm||\sum w_jU_j$, it gives running times $O(P^{m-1}n)$, $O(P^{m-1}n)$, and $O(P^mn)$, respectively, where $P$ is the total processing time. Recent SETH-based lower bounds indicate that the dependence on $P$ is essentially optimal, but they do not rule out improved dependence on the maximum processing time $p_{\max}$. We give the first major speedup of the Lawler-Moore recurrence. Our main ingredients are a new state-pruning method and a swapping argument based on an additive-combinatorial lemma. We prove that, whenever this swap does not increase the objective value, there exists an optimal schedule in which, for every prefix of jobs, the load difference between any two machines is at most $4p_{\max}^2$. This lets us prune redundant states throughout the dynamic program, replacing the dependence on $P$ by a dependence on $p_{\max}^2$. We show that the swap is non-increasing for all three objectives above. Hence $Pm||\sum w_jC_j$ and $Pm||L_{\max}$ admit algorithms with running time $O(p_{\max}^{2m-2}n)$, while $Pm||\sum w_jU_j$ can be solved in time $O(p_{\max}^{2m-2}Pn)\le O(p_{\max}^{2m-1}n^2)$. These bounds strictly improve the original Lawler-Moore runtimes whenever $p_{\max}=o(\sqrt{P})$. In particular, for $Pm||\sum w_jC_j$ and $Pm||L_{\max}$, we obtain the first near-linear-time algorithms when processing times are polylogarithmic in $n$.

cs.DS

A Parametrized Complexity View on Robust Scheduling with Budgeted Uncertainty

In this study, we investigate a robust single-machine scheduling problem under processing time uncertainty. The uncertainty is modeled using the budgeted approach, where each job has a nominal and deviation processing time, and the number of deviations is bounded by Γ. The objective is to minimize the number of tardy jobs where a job is considered tardy if there is some scenario in which it is completed after its due date. Since the problem is NP-hard in general, we focus on analyzing its tractability under the assumption that certain natural parameters of the problem are each bounded by a constant. We consider three parameters: the robustness parameter Γ, the number of distinct due dates in the instance, and the number of jobs with nonzero deviations. Using parameterized-complexity theory, we prove that the problem is W[1]-hard with respect to Γ, but can be solved in XP time with respect to the same parameter. With respect to the number of distinct due dates, we establish a stronger hardness result by showing that the problem remains NP-hard even when there are only two different due dates and is solvable in pseudo-polynomial time when the number of due dates is upper bounded by a constant. To complement these results, we show that the case of a common (single) due date reduces to a robust binary knapsack problem with equal item profits, a problem we prove to be solvable in polynomial time. Finally, we prove that the problem is fixed-parameter tractable with respect to the number of jobs with nonzero deviations.

cs.DM

New Complexity Results for Fair Repetitive Scheduling

We revisit the problem of finding fair solutions to repetitive scheduling problems with a single machine. In this problem, we are given a set of $n$ clients and a planning horizon consisting of $q$ periods (days). Each day, every client submits a single job that must be processed by the machine. The objective is to construct a set of $q$ schedules, one for each day, such that the quality of service (QoS) received by each client meets a predefined threshold. The QoS measure may be any standard scheduling criterion, such as the total waiting time or total completion time of a client's jobs over the entire planning horizon. This problem has been studied in the literature, with previous works providing complexity classifications and approximation algorithms for various QoS measures. Nevertheless, several important questions remain open. In this paper, we resolve three of these questions and identify several additional directions for future research.

cs.DS

Approximate Total Weighted Completion Time with Convex Controllable Processing Times

We study the single-machine scheduling problem with controllable processing times to minimize the total weighted completion time, focusing on the setting where a job's processing time is a convex function of its allocated continuous resource. The computational complexity of this problem represents a long-standing open question, as it is currently neither known to be polynomial-time solvable nor NP-hard. While we do not fully resolve this complexity question, we provide several insights into the problem's approximability. On the positive side, we present a polynomial-time $e \le 2.719$-approximation algorithm, alongside a quasi-polynomial approximation scheme for instances where the largest parameter value is polynomially bounded by the instance size. On the negative side, we demonstrate that simple sorting rules, which are optimal for certain special cases in the literature, cannot guarantee a constant-factor approximation for the general case.

cs.DS

Robust Permutation Flowshops Under Budgeted Uncertainty

We consider the robust permutation flowshop problem under the budgeted uncertainty model, where at most a given number of job processing times may deviate on each machine. We show that solutions for this problem can be determined by solving polynomially many instances of the corresponding nominal problem. As a direct consequence, our result implies that this robust flowshop problem can be solved in polynomial time for two machines, and can be approximated in polynomial time for any fixed number of machines. The reduction that is our main result follows from an analysis similar to Bertsimas and Sim (2003) except that dualization is applied to the terms of a min-max objective rather than to a linear objective function. Our result may be surprising considering that heuristic and exact integer programming based methods have been developed in the literature for solving the two-machine flowshop problem. Next, we show a logarithmic factor improvement in the overall running time implied by a naive reduction to nominal problems in the case of two machines and three machines. We conclude by noting that our reduction appears to have more general consequences for robust optimization problems under budgeted uncertainty having a similar form.

cs.DS

Fast Makespan Minimization via Short ILPs

Short integer linear programs are programs with a relatively small number of constraints. We show how recent improvements on the running-times of solvers for such programs can be used to obtain fast pseudo-polynomial time algorithms for makespan minimization on a fixed number of parallel machines, and other related variants. The running times of our algorithms are all of the form $\widetilde{O}(p^{O(1)}_{\max}+n)$ or $\widetilde{O}(p^{O(1)}_{\max} \cdot n)$, where $p_{\max}$ is the maximum processing time in the input. These improve upon the time complexity of previously known algorithms for moderate values of $p_{\max}$.

cs.DS

Approximation Algorithms for Fair Repetitive Scheduling

We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job processing permutation for each day, aiming to minimize the maximum total completion time experienced by any client. This problem is known to be NP-hard for quite restrictive settings, with previous work offering exact solution methods for highly-structured special cases. In this paper, we focus on the design of approximation algorithms with provable performance guarantees. Our main contributions can be briefly summarized as follows: (i) When job processing times are day-dependent, we devise a polynomial-time LP-based $2$-approximation, as well as a polynomial-time approximation scheme for a constant number of days. (ii) With day-invariant processing times, we obtain a surprisingly simple $(\frac{1+\sqrt{2}}{2}+ε)$-approximation in polynomial time. This setting is also shown to admit a quasi-polynomial-time approximation scheme for an arbitrary number of days. The key technical component driving our approximation schemes is a novel batching technique, where jobs are conceptually grouped into batches, subsequently leading either to a low-dimensional dynamic program or to a compact configuration LP. Concurrently, while developing our constant-factor approximations, we propose a host of lower-bounding mechanisms that may be of broader interest.

cs.DS

Faster Minimization of Total Weighted Completion Time on Parallel Machines

We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This problem is well known to be NP-hard, but only in the ordinary sense, and appears as one of the fundamental problems in any scheduling textbook. In particular, the problem served as a proof of concept for applying pseudo-polynomial time algorithms and approximation schemes to scheduling problems. The fastest known pseudo-polynomial time algorithm for $Pm||\sum w_jC_j$ is the famous Lawler and Moore algorithm from the late 1960's which runs in $\tilde{O}(P^{m-1}n)$ time, where $P$ is the total processing time of all jobs in the input. After more than 50 years, we are the first to present an algorithm, alternative to that of Lawler and Moore, which is faster for certain range of the problem parameters (e.g., when their values are all $O(1)$).

cs.DS

Minimizing the Number of Tardy Jobs and Maximal Tardiness on a Single Machine is NP-hard

This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic approach with the maximal tardiness being the primary criterion. Accordingly, the objective is to find, among all solutions minimizing the maximal tardiness, the one which has the minimum number of tardy jobs. The complexity of this problem has been open for over thirty years, and has been known since then to be one of the most challenging open questions in multicriteria scheduling. We resolve this question by proving that the problem is strongly NP-hard. We also prove that the problem is at least weakly NP-hard when we switch roles between the two criteria (i.e., when the number of tardy jobs is the primary criterion). Finally, we provide hardness results for two other approaches (constraint and a priori approaches) to deal with these two criteria.

cs.DS

Fair Repetitive Interval Scheduling

Fair resource allocation is undoubtedly a crucial factor in customer satisfaction in several scheduling scenarios. This is especially apparent in repetitive scheduling models where the same set of clients repeatedly submits jobs on a daily basis. In this paper, we aim to analyze a repetitive scheduling system involving a set of $n$ clients and a set of $m$ days. On every day, each client submits a request to process a job exactly within a specific time interval, which may vary from day to day, modeling the scenario where the scheduling is done Just-In-Time (JIT). The daily schedule is executed on a single machine that can process a single job at a time, therefore it is not possible to schedule jobs with intersecting time intervals. Accordingly, a feasible solution corresponds to sets of jobs with disjoint time intervals, one set per day. We define the quality of service (QoS) that a client receives as the number of executed jobs over the $m$ days period. Our objective is to provide a feasible solution where each client has at least $k$ days where his jobs are processed. We prove that this problem is NP-hard even under various natural restrictions such as identical processing times and day-independent due dates. We also provide efficient algorithms for several special cases and analyze the parameterized tractability of the problem with respect to several parameters, providing both parameterized hardness and tractability results.

cs.DS

Fairness in Repetitive Scheduling

Recent research found that fairness plays a key role in customer satisfaction. Therefore, many manufacturing and services industries have become aware of the need to treat customers fairly. Still, there is a huge lack of models that enable industries to make operational decisions fairly, such as a fair scheduling of the customers' jobs. Our main aim in this research is to provide a unified framework to enable schedulers making fair decisions in repetitive scheduling environments. For doing so, we consider a set of repetitive scheduling problems involving a set of $n$ clients. In each out of $q$ consecutive operational periods (e.g. days), each one of the customers submits a job for processing by an operational system. The scheduler's aim is to provide a schedule for each of the $q$ periods such that the quality of service (QoS) received by each of the clients will meet a certain predefined threshold. The QoS of a client may take several different forms, e.g., the number of days that the customer receives its job later than a given due-date, the number of times the customer receive his preferred time slot for service, or the sum of waiting times for service. We analyze the single machine variant of the problem for several different definitions of QoS, and classify the complexity of the corresponding problems using the theories of classical and parameterized complexity. We also study the price of fairness, i.e., the loss in the system's efficiency that results from the need to provide fair solutions.

cs.DS

No Polynomial Kernels for Knapsack

This paper focuses on kernelization algorithms for the fundamental Knapsack problem. A kernelization algorithm (or kernel) is a polynomial-time reduction from a problem onto itself, where the output size is bounded by a function of some problem-specific parameter. Such algorithms provide a theoretical model for data reduction and preprocessing and are central in the area of parameterized complexity. In this way, a kernel for Knapsack for some parameter $k$ reduces any instance of Knapsack to an equivalent instance of size at most $f(k)$ in polynomial time, for some computable function $f(\cdot)$. When $f(k)=k^{O(1)}$ then we call such a reduction a polynomial kernel. Our study focuses on two natural parameters for Knapsack: The number of different item weights $w_{\#}$, and the number of different item profits $p_{\#}$. Our main technical contribution is a proof showing that Knapsack does not admit a polynomial kernel for any of these two parameters under standard complexity-theoretic assumptions. Our proof discovers an elaborate application of the standard kernelization lower bound framework, and develops along the way novel ideas that should be useful for other problems as well. We complement our lower bounds by showing the Knapsack admits a polynomial kernel for the combined parameter $w_{\#}+p_{\#}$.

cs.DS

Minimizing the Weighted Number of Tardy Jobs via (max,+)-Convolutions

The $1 \mid \mid Σw_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs. This is a classical scheduling problem that generalizes both Knapsack, and Subset Sum. The best known pseudo-polynomial algorithm for $1 \mid \mid Σw_j U_j$, due to Lawler and Moore [Management Science'69], dates back to the late 60s and has a running time of $O(d_{\max}n)$, where $n$ is the number of jobs and $d_{\max}$ is their maximal due date. A recent lower bound by Cygan \emph{et al.}~[ICALP'19] for Knapsack shows that $1 \mid \mid Σw_j U_j$ cannot be solved in $\widetilde{O}((n+d_{\max})^{2-\varepsilon})$ time, for any $\varepsilon > 0$, under a plausible conjecture. This still leaves a gap between the best known lower bound and upper bound for the problem. In this paper we design a new simple algorithm for $1 \mid \mid Σw_j U_j$ that uses $(\max,+)$-convolutions as its main tool, and outperforms the Lawler and Moore algorithm under several parameter ranges. In particular, depending on the specific method of computing $(\max,+)$-convolutions, its running time can be bounded by - $\widetilde{O}(n+d_{\#}d_{\max}^2)$. - $\widetilde{O}(d_{\#}n +d^2_{\#}d_{\max}w_{\max})$. - $\widetilde{O}(d_{\#}n +d_{\#}d_{\max}p_{\max})$. - $\widetilde{O}(n^2 +d_{\max}w^2_{\max})$. - $\widetilde{O}(n^2 + d_{\#}(d_{\max}w_{\max})^{1.5})$. Here, $d_{\#}$ denotes the number of \emph{different} due dates in the instance, $p_{\max}$ denotes the maximum processing time of any job, and $w_{\max}$ denotes the maximum weight of any job.

cs.DS

Hardness of Interval Scheduling on Unrelated Machines

We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly at their deadline. We are given $n$ jobs and $m$ machines. Each job has a deadline, a weight, and a processing time that may be different on each machine. The goal is find a schedule that maximized the total weight of jobs completed exactly at their deadline. Note that this uniquely defines a processing time interval for each job on each machine. Interval Scheduling on Unrelated Machines is closely related to coloring interval graphs and has been thoroughly studied for several decades. However, as pointed out by Mnich and van Bevern [Computers \& Operations Research, 2018], the parameterized complexity for the number $m$ of machines as a parameter remained open. We resolve this by showing that Interval Scheduling on Unrelated Machines is W[1]-hard when parameterized by the number $m$ of machines. To this end, we prove W[1]-hardness with respect to $m$ of the special case where we have parallel machines with eligible machine sets for jobs. This answers Open Problem 8 of Mnich and van Bevern's list of 15 open problems in the parameterized complexity of scheduling [Computers \& Operations Research, 2018]. Furthermore, we resolve the computational complexity status of the unweighted version of Interval Scheduling on Unrelated Machines by proving that it is NP-complete. This answers an open question by Sung and Vlach [Journal of Scheduling, 2005].

cs.CC

Equitable Scheduling on a Single Machine

We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of the problem at once. In particular, we have $n$ clients over a period of $m$ days, where each client has a single job with its own processing time and deadline per day. Our goal is to provide a schedule for each of the $m$ days, so that each client is guaranteed to have their job meet its deadline in at least $k \le m$ days. This corresponds to an equitable schedule where each client is guaranteed a minimal level of service throughout the period of $m$ days. We provide a thorough analysis of the computational complexity of three main variants of this problem, identifying both efficient algorithms and worst-case intractability results.

cs.DM

SETH-Based Lower Bounds for Subset Sum and Bicriteria Path

Subset-Sum and k-SAT are two of the most extensively studied problems in computer science, and conjectures about their hardness are among the cornerstones of fine-grained complexity. One of the most intriguing open problems in this area is to base the hardness of one of these problems on the other. Our main result is a tight reduction from k-SAT to Subset-Sum on dense instances, proving that Bellman's 1962 pseudo-polynomial $O^{*}(T)$-time algorithm for Subset-Sum on $n$ numbers and target $T$ cannot be improved to time $T^{1-\varepsilon}\cdot 2^{o(n)}$ for any $\varepsilon>0$, unless the Strong Exponential Time Hypothesis (SETH) fails. This is one of the strongest known connections between any two of the core problems of fine-grained complexity. As a corollary, we prove a "Direct-OR" theorem for Subset-Sum under SETH, offering a new tool for proving conditional lower bounds: It is now possible to assume that deciding whether one out of $N$ given instances of Subset-Sum is a YES instance requires time $(N T)^{1-o(1)}$. As an application of this corollary, we prove a tight SETH-based lower bound for the classical Bicriteria s,t-Path problem, which is extensively studied in Operations Research. We separate its complexity from that of Subset-Sum: On graphs with $m$ edges and edge lengths bounded by $L$, we show that the $O(Lm)$ pseudo-polynomial time algorithm by Joksch from 1966 cannot be improved to $\tilde{O}(L+m)$, in contrast to a recent improvement for Subset Sum (Bringmann, SODA 2017).

cs.DS

Scheduling Lower Bounds via AND Subset Sum

Given $N$ instances $(X_1,t_1),\ldots,(X_N,t_N)$ of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers $X_i$ has a subset that sums up to the target integer $t_i$. We prove that this problem cannot be solved in time $\tilde{O}((N \cdot t_{max})^{1-ε})$, for $t_{max}=\max_i t_i$ and any $ε> 0$, assuming the $\forall \exists$ Strong Exponential Time Hypothesis ($\forall \exists$-SETH). We then use this result to exclude $\tilde{O}(n+P_{max} \cdot n^{1-ε})$-time algorithms for several scheduling problems on $n$ jobs with maximum processing time $P_{max}$, based on $\forall \exists$-SETH. These include classical problems such as $1||\sum w_jU_j$, the problem of minimizing the total weight of tardy jobs on a single machine, and $P_2||\sum U_j$, the problem of minimizing the number of tardy jobs on two identical parallel machines.

cs.DS

Faster Minimization of Tardy Processing Time on a Single Machine

This paper is concerned with the $1||\sum p_jU_j$ problem, the problem of minimizing the total processing time of tardy jobs on a single machine. This is not only a fundamental scheduling problem, but also a very important problem from a theoretical point of view as it generalizes the Subset Sum problem and is closely related to the 0/1-Knapsack problem. The problem is well-known to be NP-hard, but only in a weak sense, meaning it admits pseudo-polynomial time algorithms. The fastest known pseudo-polynomial time algorithm for the problem is the famous Lawler and Moore algorithm which runs in $O(P \cdot n)$ time, where $P$ is the total processing time of all $n$ jobs in the input. This algorithm has been developed in the late 60s, and has yet to be improved to date. In this paper we develop two new algorithms for $1||\sum p_jU_j$, each improving on Lawler and Moore's algorithm in a different scenario. Both algorithms rely on basic primitive operations between sets of integers and vectors of integers for the speedup in their running times. The second algorithm relies on fast polynomial multiplication as its main engine, while for the first algorithm we define a new "skewed" version of $(\max,\min)$-convolution which is interesting in its own right.

cs.DS