Searcharxiv⌕ Search

arXiv subjects

E. O. Sushenok

Publications and source records attributed to E. O. Sushenok.

22 records · Page 2Linked to original sources

The Baikal-GVD detector calibration

In April 2019, the Baikal-GVD collaboration finished the installation of the fourth and fifth clusters of the neutrino telescope Baikal-GVD. Momentarily, 1440 Optical Modules (OM) are installed in the largest and deepest freshwater lake in the world, Lake Baikal, instrumenting 0.25 cubic km of sensitive volume. The Baikal-GVD is thus the largest neutrino telescope on the Northern Hemisphere. The first phase of the detector construction is going to be finished in 2021 with 9 clusters, 2592 OMs in total, however the already installed clusters are stand-alone units which are independently operational and taking data from their commissioning. Huge number of channels as well as strict requirements for the precision of the time and charge calibration (ns, p.e.) make calibration procedures vital and very complex tasks. The inter cluster time calibration is performed with numerous calibration systems. The charge calibration is carried out with a Single Photo-Electron peak. The various data acquired during the last three years in regular and special calibration runs validate successful performance of the calibration systems and of the developed calibration techniques. The precision of the charge calibration has been improved and the time dependence of the obtained calibration parameters have been cross-checked. The multiple calibration sources verified a 1.5 - 2.0 ns precision of the in-situ time calibrations. The time walk effect has been studied in detail with in situ specialized calibration runs.

astro-ph.IM↗

A positioning system for Baikal-GVD

A cubic kilometer scale neutrino telescope Baikal-GVD is currently under construction in Lake Baikal. Baikal-GVD is designed to detect Cerenkov radiation from products of astrophysical neutrino interactions with Baikal water by a lattice of photodetectors submerged between the depths of 1275 and 730 m. The detector components are mounted on flexible strings and can drift from their initial positions upwards to tens of meters. This introduces positioning uncertainty which translates into a timing error for Cerenkov signal registration. A spatial positioning system has been developed to resolve this issue. In this contribution, we present the status of this system, results of acoustic measurements and an estimate of positioning error for an individual component.

astro-ph.IM↗

The inter-cluster time synchronization systems within the Baikal-GVD detector

Currently in Lake Baikal, a new generation neutrino telescope is being deployed: the deep underwater Cherenkov detector of a cubic-kilometer scale Baikal-GVD. Completion of the first stage of the telescope construction is planned for 2021 with the implementation of 9 clusters. Each cluster is a completely independent unit in all the aspects: triggering, calibration, data transfer, etc. A high-energy particle might leave its trace in more than a single cluster. To be able to merge events caused by such a particle in more clusters, the appropriate inter-cluster time synchronization is vital.

physics.ins-det↗

Multi-neutron emission of Cd isotopes

An influence of the phonon-phonon coupling (PPC) on the $β$-decay half-lives and multi-neutron emission probabilities is analysed within the microscopic model based on the Skyrme interaction with tensor components included. The finite-rank separable approximation is used in order to handle large two-quasiparticle spaces. The even-even nuclei near the r-process pathes at $N=82$ are studied. The characteristics of ground states, $2^+$ excitations and $β$-decay strength of the neutron-rich Cd isotopes are treated in detail. It is shown that a strong redistribution of the Gamow-Teller strength due to the PPC is mostly sensitive to the multi-neutron emission probability of the Cd isotopes.

nucl-th↗