SearcharxivSearch

arXiv subjects

E. Pozdeyev

Publications and source records attributed to E. Pozdeyev.

9 recordsLinked to original sources

PIII Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

physics.acc-ph

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns inside the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is important to measure the presence of electron cloud. The presence or apparent absence of the electron cloud was investigated using two different methods: measuring bunch-by-bunch tune shift by changing the bunch train structure at different intensities and propagating a microwave carrier signal through the beampipe and analyzing the phase modulation of the signal. This paper presents the results of the two methods and corresponding simulation results conducted using PyECLOUD software.

physics.acc-ph

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade: a Snowmass 2021 White Paper

Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experiments. In this white paper, we propose an 8 GeV Linac for that purpose. The Linac consists of an extension of the PIP-II Linac to ~2 GeV using PIP-II 650 MHz SRF cryomodules, followed by a 2 -->8.0 GeV Linac composed of 1300 MHz SRF cryomodules, based upon the LCLS-II cryomodules developed at Fermilab. The 8 GeV Linac will incorporate recent improvements in SRF technology. The research needed to implement this Linac is described.

physics.acc-ph

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

physics.acc-ph

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns in the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is essential to discover any existence of an electron cloud. And if it does, its effects on the PIP-II era Booster and its mitigating techniques. As the first step, the presence or absence of the electron cloud was investigated using the clearing bunch technique. This paper presents experimental details and observations of the bunch-by-bunch tune shifts of beams with various bunch train structures at low and high intensities and simulation results conducted using PyECLOUD.

physics.acc-ph

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

physics.acc-ph

RHIC Low-Energy Challenges and Plans

There is significant interest in RHIC heavy ion collisions at $\sqrt{s_{NN}}=$5--50 GeV, motivated by a search for the QCD phase transition critical point. The lowest energies for this search are well below the nominal RHIC gold injection collision energy of $\sqrt{s_{NN}}=19.6$ GeV. There are several operations challenges at RHIC in this regime, including longitudinal acceptance, magnet field quality, lattice control, and luminosity monitoring. We report on the status of work to address these challenges, including results from beam tests of low energy RHIC operations with protons and gold, and potential improvements from different beam cooling scenarios.

physics.acc-ph

Analysis of a Cyclotron Based 400 MeV/u Driver System for a Radioactive Beam Facility

The creation of intense radioactive beams requires intense and energetic primary beams. A task force analysis of this subject recommended an acceleration system capable of 400 MeV/u uranium at 1 particle uA as an appropriate driver for such a facility. The driver system should be capable of accelerating lighter ions at higher intensity such that a constant final beam power (~100kW) is maintained. This document is a more detailed follow on to the previous analysis of such a system incorporating a cyclotron. The proposed driver pre-acceleration system consists of an ion source, radio frequency quadrupole, and linac chain capable of producing a final energy of 30 MeV/u and a charge (Q) to mass (A) of Q/A ~1/3. This acceleration system would be followed by a Separated Sector Cyclotron with a final output energy of 400 MeV/u. This system provides a more cost-effective solution in terms of initial capital investment as well as of operation compared to a fully linac system with the same primary beam output parameters.

nucl-ex