Real-Time Control of Sustainable Data Centers: A Two-Layer Model Predictive Control Framework with Workload Flexibility and Heat Recovery

This paper proposes a two-layer model predictive control (MPC) framework for the real-time operation of data centers integrated with on-site photovoltaic generation, battery energy storage, waste heat recovery, and district heating. The upper layer employs scenario-based stochastic optimization to jointly optimize intraday market participation, workload scheduling, and energy management under uncertainty. The lower layer adopts an adaptive tube-based MPC strategy that compensates short-term disturbances while tracking the dispatch references given by the upper layer. The framework further integrates multi-horizon forecasting to support real-time decision making. Microservice-based simulation studies under representative clear-sky and overcast operating conditions demonstrate that the proposed framework accurately tracks dispatch plans despite fast photovoltaic and workload fluctuations. Compared with single-layer control strategies, the adaptive lower-layer controller substantially reduces real-time dispatch deviations and the associated imbalance costs. In addition, the proposed framework naturally adapts to seasonal operating conditions and responds to carbon-aware operating signals, offering a practical approach for economically efficient, sustainable, and grid-supportive operation of future data centers.

eess.SY

Should Small-Scale Data Centers Participate in the Day-Ahead Electricity Market?

The global race to artificial intelligence competitive advantage is challenging electricity grids by demanding growing data center capacity. Addressing this challenge requires synergistic operational strategies that integrate data centers into electricity markets while supporting grid operation. This work proposes a bilateral power purchase agreement between small-scale data centers and distribution system operators, enabling data center participation in the day-ahead electricity market. To facilitate market participation, we develop a scenario-based, risk-averse bidding strategy that leverages flexibility from local energy resources, waste heat recovery, and data center workload. The strategy jointly minimizes operational costs and carbon emissions, creating a carbon-aware cost-effective framework for data center integration in the electricity day-ahead market. The method is evaluated on a study case comparing a conventional time-of-use supply scheme with the proposed custom power purchase agreement, showing a potential 22\% cost reduction, thus highlighting financial opportunities for small-scale data centers day-ahead electricity market participation. Two additional case studies illustrate the marginal effects of: (i) data center flexible workload on energy costs and (ii) virtual de-rating of grid transfer capacity.

eess.SY

Achieving Dispatchability in Data Centers: Carbon and Cost-Aware Sizing of Energy Storage and Local Photovoltaic Generation

Data centers are large electricity consumers due to the high consumption needs of servers and their cooling systems. Given the current crypto-currency and artificial intelligence trends, the data center electricity demand is bound to grow significantly. With the electricity sector being responsible for a large share of global greenhouse gas (GHG) emissions, it is important to lower the carbon footprint of data centers to meet GHG emissions targets set by international agreements. Moreover, uncontrolled integration of data centers in power distribution grids contributes to increasing the stochasticity of the power system demand, thus increasing the need for capacity reserves, which leads to economic and environmental inefficiencies in the power grid operation. This work provides a method to size a PhotoVoltaic (PV) system and an Energy Storage System (ESS) for an existing data center looking to reduce both its carbon footprint and demand stochasticity via dispatching. The proposed scenario-based optimization framework allows to size the ESS and the PV system to minimize the expected operational and capital costs, along with the carbon footprint of the data center complex. The life cycle assessment of the resources, as well as the dynamic carbon emissions of the upstream power distribution grid, are accounted for while computing the day-ahead planning of the data center aggregated demand and PV generation. Case studies in different Swiss cantons and regions of Germany emphasize the need for location-aware sizing processes since the obtained optimal solutions strongly depend on the local electricity carbon footprint, cost and on the local irradiance conditions. Some regions show potential in carbon footprint reduction, while other regions do not.

eess.SY

Grid-aware Scheduling and Control of Electric Vehicle Charging Stations for Dispatching Active Distribution Networks. Part-I: Day-ahead and Numerical Validation

This paper proposes a grid-aware scheduling and control framework for Electric Vehicle Charging Stations (EVCSs) for dispatching the operation of an active power distribution network. The framework consists of two stages. In the first stage, we determine an optimal day-ahead power schedule at the grid connection point (GCP), referred to as the dispatch plan. Then, in the second stage, a real-time model predictive control is proposed to track the day-ahead dispatch plan using flexibility from EVCSs. The dispatch plan accounts for the uncertainties of vehicles connected to the EVCS along with other uncontrollable power injections, by day-ahead predicted scenarios. We propose using a Gaussian-Mixture-Model (GMM) for the forecasting of EVCS demand using the historical dataset on arrival, departure times, EV battery capacity, State-of-Charge (SoC) targets, etc. The framework ensures that the grid is operated within its voltage and branches power-flow operational bounds, modeled by a linearized optimal power-flow model, maintaining the tractability of the problem formulation. The scheme is numerically and experimentally validated on a real-life distribution network at the EPFL connected to two EVCSs, two batteries, three photovoltaic plants, and multiple heterogeneous loads. The day-ahead and real-time stages are described in Part-I and Part-II papers respectively.

eess.SY

Grid-aware Scheduling and Control of Electric Vehicle Charging Stations for Dispatching Active Distribution Networks. Part-II: Intra-day and Experimental Validation

In Part-I, we presented an optimal day-ahead scheduling scheme for dispatching active distribution networks accounting for the flexibility provided by electric vehicle charging stations (EVCSs) and other controllable resources such as battery energy storage systems (BESSs). Part-II presents the intra-day control layer for tracking the dispatch plan computed from the day-ahead scheduling stage. The control problem is formulated as model predictive control (MPC) with an objective to track the dispatch plan setpoint every 5 minutes, while actuated every 30 seconds. MPC accounts for the uncertainty of the power injections from stochastic resources (such as demand and generation from photovoltaic - PV plants) by short-term forecasts. MPC also accounts for the grid's operational constraints (i.e., the limits on the nodal voltages and the line power-flows) by a linearized optimal power flow (LOPF) model based on the power-flow sensitivity coefficients, and for the operational constraints of the controllable resources (i.e., BESSs and EVCSs). The proposed framework is experimentally validated on a real-life ADN at the EPFL's Distributed Electrical Systems Laboratory and is composed of a medium voltage (MV) bus connected to three low voltage distribution networks. It hosts two controllable EVCSs (172 kWp and 32 F~kWp), multiple PV plants (aggregated generation of 42~kWp), uncontrollable demand from office buildings (20 kWp), and two controllable BESSs (150kW/300kWh and 25kW/25kWh).