Searcharxiv⌕ Search

arXiv subjects

Erhun Özkan

Publications and source records attributed to Erhun Özkan.

2 recordsLinked to original sources

On the Optimal Control of Parallel Processing Networks with Resource Collaboration and Multitasking

We study scheduling control of parallel processing networks in which some resources need to simultaneously collaborate to perform some activities and some resources multitask. Resource collaboration and multitasking give rise to synchronization constraints in resource scheduling when the resources are not divisible, that is, when the resources cannot be split. The synchronization constraints affect the system performance significantly. For example, because of those constraints, the system capacity can be strictly less than the capacity of the bottleneck resource. Furthermore, the resource scheduling decisions are not trivial under those constraints. For example, not all static prioritization policies retain the maximum system capacity and the ones that retain the maximum system capacity do not necessarily minimize the delay (or in general the holding cost). We study optimal scheduling control of a class of parallel networks and propose a dynamic prioritization policy that retains the maximum system capacity and is asymptotically optimal in diffusion scale and conventional heavy-traffic regime with respect to the expected discounted total holding cost objective.

math.OC↗

On the Control of Fork-Join Networks

Networks in which the processing of jobs occurs both sequentially and in parallel are prevalent in many application domains, such as computer systems, healthcare, manufacturing, and project management. The parallel processing of jobs gives rise to synchronization constraints that can be a main reason for job delay. In comparison with feedforward queueing networks that have only sequential processing of jobs, the approximation and control of networks that have synchronization constraints is less understood. One well-known modeling framework in which synchronization constraints are prominent is the fork-join processing network. Our objective is to find scheduling rules for fork-join processing networks with multiple job types in which there is first a fork operation, then activities that can be performed in parallel, and then a join operation. The difficulty is that some of the activities that can be performed in parallel require a shared resource. We solve the scheduling problem for that shared server (that is, which type of job to prioritize each time the server becomes available) when that server is in heavy traffic and prove an asymptotic optimality result.

math.PR↗