SearcharxivSearch

arXiv subjects

F. Hagenbuck

Publications and source records attributed to F. Hagenbuck.

2 recordsLinked to original sources

FAIR Commissioning - Towards First Science

The international Facility for Antiproton and Ion Research (FAIR) is under construction at the GSI Helmholtz Centre in Darmstadt. The first project stage includes the superconducting 100 Tm heavy-ion synchrotron SIS100, the Super Fragment Separator, and associated beam transport lines. Part of GSI's existing accelerator chain, comprising UNILAC and SIS18, will serve as injector. Installation work in the FAIR accelerator tunnels and supply buildings has been ongoing since early 2024. As progress continues, special attention is now on the start of commissioning, beginning in 2025 with the cryogenic plant. Commissioning of the transport line will follow at the end of 2025, and beam commissioning is scheduled for the second half of 2027. This paper outlines the current status of the project, commissioning strategy and timeline.

physics.acc-ph

First experiments with a 100 period superconductive undulator with a period length of 3.8 mm

A prototype of a novel superconductive undulator with a period length of 3.8 mm is described. The undulator is 100 periods long. In the first tests described in this paper the undulator was cooled in a helium bath and it was shown that it can be operated as expected with a maximum current of 1400 A. Afterwards the undulator field was measured with a miniature Hall probe with an active area of (100x100)x10^-6 m^2. Calculated and measured field distributions are in good agreement. A cryostat for a beam test at Mainz microtron MAMI was built in which liquid helium cools indirectly the in-vacuum undulator. At the moment the cryostat is tested and optimized.

physics.acc-ph