SearcharxivSearch

arXiv subjects

F. Veronese

Publications and source records attributed to F. Veronese.

3 recordsLinked to original sources

Fusion of 12C+28Si at deep sub-barrier energies

The existence of fusion hindrance is not well established in light heavy-ion systems. Studying slightly heavier cases allows extrapolating the trend to light systems of astrophysical interest. Fusion of 12C + 28Si has been measured down to deep sub-barrier energies, using 28Si beams from the XTU Tandem accelerator of LNL on thin 12C targets. The fusion-evaporation residues were detected by a detector telescope following an electrostatic beam separator, and coincidences between the gamma-ray array AGATA and segmented silicon detectors DSSD were performed, where the evaporated light charged particles were identified by pulse shape analysis. Fusion cross sections have been obtained in the wide range 150 mb-42 nb. Coupled-channel (CC) calculations using a Woods-Saxon potential reproduce the data above 0.1 mb. Below that, hindrance shows up and the CC results overestimate the cross sections which get close to the one-dimensional potential tunnelling limit. This suggests that the coupling strengths gradually vanish, as predicted by the adiabatic model. The hindrance threshold follows a recently updated phenomenological systematics.

nucl-ex

Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.

physics.plasm-ph

Conceptual design of the Gas Injection and Vacuum System for DTT NBI

The Divertor Tokamak Test (DTT) is a new experimental facility whose construction is starting in Frascati, Rome, Italy; its main goals are improving the understanding of plasma-wall interactions and supporting the development of ITER and DEMO. DTT will be equipped with a Neutral Beam Injector (NBI) based on negative deuterium ions, designed to inject 10 MW of power to the tokamak. A fundamental system for the good operations of the DTT NBI will be its Gas injection and Vacuum System (GVS). Indeed, the efficiency of the entire NBI strongly depends on the good performance of its GVS. The GVS for DTT NBI will be composed of two systems working in parallel: a grounded section connected to the main vacuum vessel, and a high voltage part connected to the ion source vessel and working at -510 kV voltage. The grounded part will feature a fore vacuum system (given by screw and roots pumps) plus a high vacuum system based on turbo-molecular pumps located on the side walls of the vessel and Non-Evaporable Getter (NEG) pumps located inside the vessel on the upper and lower surfaces. On the other hand, the high voltage part will feature a fore vacuum system (given by two compact screw pumps mounted on the external surface for the ion source vessel) plus a high vacuum system based on turbo-molecular pumps also located on the sidewalls of the ion source vessel. A dedicated deuterium gas injection will feed the process gas to the ion source and the neutralizer. This paper gives a description of the conceptual design of the GVS for DTT NBI, and of the procedure followed to optimize this system considering the operational requirements and the other constraints of the DTT NBI.

physics.plasm-ph