SearcharxivSearch

arXiv subjects

Fusashi Miyahara

Publications and source records attributed to Fusashi Miyahara.

3 recordsLinked to original sources

Search for Sub-GeV Axion-Like Particles at EBES Pilot Run Using 4 GeV Positron Beam at KEK LINAC

We report the results of a search for sub-GeV axion-like particles (ALPs) using pilot run data from the Electron Beam-dump Experiment at KEK LINAC Switching Yard 3 (EBES). The data were collected in December 2023 with a 4 GeV positron beam and correspond to $1.3\times10^{14}$ positrons on target. In the pilot run setup, a tungsten beam dump and a single PbO calorimeter were used. We consider ALP production via the Primakoff process induced by bremsstrahlung photons in the beam dump, followed by the decay $a\toγγ$. The background was estimated with a data-driven method, and a signal region was defined such that the expected background yield is below 0.1 events. No events were observed after unblinding. Upper limits at the 90% confidence level were derived in the ALP mass-coupling plane, extending the experimental coverage into a region of parameter space not explored by previous searches.

hep-ex

Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac

KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.

physics.acc-ph

Analysis and Stabilization of AC Line Synchronized Timing System for SuperKEKB

A timing system provides high-precision signals to allow the controls over a variety of hardware and software components in the accelerator complex. This is guaranteed by the radio frequency (RF) and trigger signal synchronization for subsystems such as klystrons, pulsed magnets, and beam monitors. The main trigger signal should be distributed throughout the facility and repeated at the beam repetition rate. This trigger signal is usually generated by the same phase of an AC power line to follow the source of the fluctuation of an electrical grid and reduce the unwanted variation of the beam quality. To fulfill the needs of the multi-accelerator facility at KEK, apart from the normal trigger synchronization and bucket selection injection control, a beam operation scheme called the pulse-to-pulse modulation is utilized; hence, the complexity of the timing system increases. Uncertainty in the system and a trigger signal delivery error caused by a drastic AC power line drift are observed. Further, the effort to establish a reliable timing system at KEK and several solutions to improve the system robustness are presented.

physics.acc-ph