SearcharxivSearch

arXiv subjects

G. Mornacchi

Publications and source records attributed to G. Mornacchi.

3 recordsLinked to original sources

Positron accumulation in the GBAR experiment

We present a description of the GBAR positron (e+) trapping apparatus, which consists of a three stage Buffer Gas Trap (BGT) followed by a High Field Penning Trap (HFT), and discuss its performance. The overall goal of the GBAR experiment is to measure the acceleration of the neutral antihydrogen (H) atom in the terrestrial gravitational field by neutralising a positive antihydrogen ion (H+), which has been cooled to a low temperature, and observing the subsequent H annihilation following free fall. To produce one H+ ion, about 10^10 positrons, efficiently converted into positronium (Ps), together with about 10^7 antiprotons (p), are required. The positrons, produced from an electron linac-based system, are accumulated first in the BGT whereafter they are stacked in the ultra-high vacuum HFT, where we have been able to trap 1.4(2) x 10^9 positrons in 1100 seconds.

physics.plasm-ph

Positron production using a 9 MeV electron linac for the GBAR experiment

For the GBAR (Gravitational Behaviour of Antihydrogen at Rest) experiment at CERN's Antiproton Decelerator (AD) facility we have constructed a source of slow positrons, which uses a low-energy electron linear accelerator (linac). The driver linac produces electrons of 9 MeV kinetic energy that create positrons from bremsstrahlung-induced pair production. Staying below 10 MeV ensures no persistent radioactive activation in the target zone and that the radiation level outside the biological shield is safe for public access. An annealed tungsten-mesh assembly placed directly behind the target acts as a positron moderator. The system produces $5\times10^7$ slow positrons per second, a performance demonstrating that a low-energy electron linac is a superior choice over positron-emitting radioactive sources for high positron flux.

physics.ins-det

Rejuvenation of the Controls for the CERN PS/Isolde Facilty Using Industrial Components

In the context of the general consolidation of the CERN ISOLDE facility, a project has been started to upgrade the ISOLDE control system. We describe the new ISOLDE control system, emphasizing the systematic use of industrial components such as PLCs and field buses, their integration with the existing, VME based, CERN PS control system and their potential applicability to both existing and new controls problems at the CERN PS complex. We also discuss how to extend a PLC-based solution to the case where real-time response is an issue.

physics.acc-ph