SearcharxivSearch

arXiv subjects

G. Velev

Publications and source records attributed to G. Velev.

7 recordsLinked to original sources

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is currently constructing a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing High Temperature Superconducting (HTS) cables under high magnetic fields. This facility is expected to offer capabilities similar to those of EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15 T will be generated by a magnet supplied by Lawrence Berkeley National Laboratory. The primary function of HFVMTF will be to serve as a superconducting cable test facility, facilitating tests under high magnetic fields and a broad spectrum of cryogenic temperatures. Additionally, the facility will be utilized for testing highfield superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Program (MDP). This paper provides a comprehensive description of the current status of two pivotal components of the facility: the Top/Lambda Plates Assembly and the Anticryostat for the Test Sample Holder. The latter will serve as a principal interface component connecting cable test samples with the facility's cryostat.

physics.acc-ph

A Strategic Approach to Advance Magnet Technology for Next Generation Colliders

Colliders are built on a foundation of superconducting magnet technology that provides strong dipole magnets to maintain the beam orbit and strong focusing magnets to enable the extraordinary luminosity required to probe physics at the energy frontier. The dipole magnet strength plays a critical role in dictating the energy reach of a collider, and the superconducting magnets are arguably the dominant cost driver for future collider facilities. As the community considers opportunities to explore new energy frontiers, the importance of advanced magnet technology - both in terms of magnet performance and in the magnet technology's potential for cost reduction - is evident, as the technology status is essential for informed decisions on targets for physics reach and facility feasibility.

physics.acc-ph

White Paper on Leading-Edge technology And Feasibility-directed (LEAF) Program aimed at readiness demonstration for Energy Frontier Circular Colliders by the next decade

In this White Paper for the Snowmass 2021 Process, we propose the establishment of a magnet Leading-Edge technology And Feasibility-directed Program (LEAF Program) to achieve readiness for a future collider decision on the timescale of the next decade. The LEAF Program would rely on, and be synergetic with, generic R&D efforts presently covered - in the US - by the Magnet Development Program (MDP), the Conductor Procurement and R&D (CPRD) Program and other activities in the Office of HEP supported by Early Career Awards (ECA) or Lab Directed R&D (LDRD) funds. Where possible, ties to synergetic efforts in other Offices of DOE or NSF are highlighted and suggested as wider Collaborative efforts on the National scale. International efforts are also mentioned as potential partners in the LEAF Program. We envision the LEAF Program to concentrate on demonstrating the feasibility of magnets for muon colliders as well as next generation high energy hadron colliders, pursuing, where necessary and warranted by the nature of the application, the transition from R&D models to long models/prototypes. The LEAF Program will naturally drive accelerator-quality and experiment-interface design considerations. LEAF will also concentrate, where necessary, on cost reduction and/or industrialization steps.

physics.acc-ph

Future Collider Options for the US

The United States has a rich history in high energy particle accelerators and colliders -- both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is the exploring of options to host a future collider in the U.S. The "Snowmass" study and the subsequent Particle Physics Project Prioritization Panel (P5) process provide the timely opportunity to develop strategies for both. What we do now will shape the future of our field and whether the U.S. will remain a world leader in these areas. In this white paper, we briefly discuss the US engagement in proposed collider projects abroad and describe future collider options for the U.S. We also call for initiating an integrated R\&D program for future colliders.

hep-ex

Design Of The LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos will be produced when the protons interact with a solid target to produce mesons which will be subsequently focused by magnetic horns into a 194m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.

physics.acc-ph

Muon (g-2) Technical Design Report

The Muon (g-2) Experiment, E989 at Fermilab, will measure the muon anomalous magnetic moment a factor-of-four more precisely than was done in E821 at the Brookhaven National Laboratory AGS. The E821 result appears to be greater than the Standard-Model prediction by more than three standard deviations. When combined with expected improvement in the Standard-Model hadronic contributions, E989 should be able to determine definitively whether or not the E821 result is evidence for physics beyond the Standard Model. After a review of the physics motivation and the basic technique, which will use the muon storage ring built at BNL and now relocated to Fermilab, the design of the new experiment is presented. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-2/3 approval.

physics.ins-det

Search for narrow resonances below the Upsilon mesons

We have investigated the invariant mass spectrum of dimuons collected by the CDF experiment during the 1992-1995 run of the Fermilab Tevatron collider to improve the limit on the existence of narrow resonances set by the experiments at the SPEAR e+e- collider. In the mass range 6.3-9.0 GeV/c^2, we derive 90% upper credible limits to the ratio of the production cross section times muonic branching fraction of possible narrow resonances to that of the Y(1S) meson. In this mass range, the average limit varies from 1.7 to 0.5%. This limit is much worse at the mass of 7.2 GeV/c^2 due to an excess of 250+-61 events with a width consistent with the detector resolution.

hep-ex