SearcharxivSearch

arXiv subjects

Giuseppe Chitarin

Publications and source records attributed to Giuseppe Chitarin.

2 recordsLinked to original sources

Repurposing acquisition devices into trigger-based timing synchronization of breakdown events during MITICA high voltage holding experiments

A critical requirement for MITICA -- a full-scale prototype of the heating Neutral Beam Injectors hosted at the Consorzio RFX Neutral Beam Test Facility for the ITER experiment -- is the capability to withstand a continuous voltage of 1MV across the vacuum gaps insulating the beam source from the grounded vessel. To validate such feature, a dedicated voltage-holding test campaign was conducted throughout 2024 and 2025 using a full-scale mock-up of the beam source. The tests also involved an accurate characterization of the associated breakdown events: vacuum dielectric failures which result in rapid potential drops and generate strong current discharges. This contribution will present a relative time reconstruction architecture based on cost-effective, embedded RedPitaya (Zynq-7000 FPGA) devices repurposed as timing hubs. These nodes function as configurable trigger multiplexers while simultaneously recording trigger signals as transients to facilitate the offline reconstruction of event sequences. The method allows self-calibration through measuring the static intrinsic delays of the optical fibers and internal logics, generating delay offsets to synchronize acquired waveforms across a sparse, connected-graph topology of both acquisition devices and hubs themselves.

physics.comp-ph

A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign

The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Voltage equipment have been individually commissioned, whereas the integration tests are ongoing. It is a challenging process due to the unconventional application, to the variety of different electrical technologies involved and to the complexity of the interfaces. During the integrated tests of the power supplies the achievement of 700kV stable operation has been demonstrated for the first time in a Neutral Beam Injector, but an unexpected event occurred, most likely a breakdown in the HV part, which resulted in a fault of the DC generator. A subsequent test using an auxiliary power supply was performed to check the voltage withstanding capability of the HV plant, but another breakdown occurred at around 1MV. This paper describes the activity performed to identify the location of the breakdowns affecting the integrated tests. A test campaign has been devised with increased diagnostic capabilities and specific strategy conceived to trigger intentional breakdowns in specific locations and collect measurement patterns for different cases. The results of the campaign will be presented and the current understanding of the issue will be described, with a view on future tests and further improvements of diagnostics.

physics.plasm-ph