AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

eess.SY↗

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

eess.SY↗

Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility

The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and voltage limits. Fixed peak load representations can overlook service dependent demand patterns, cooling related facility demand, and delay tolerant computing tasks. This paper develops a hosting capacity (HC) assessment model for edge DCs with shiftable workload scheduling. Three representative types are considered: mobile edge computing (MEC), content delivery network (CDN), and AI DCs. Facility demand is modeled by combining fixed base demand, service driven demand, prescribed cooling-overhead coefficient, and a shiftable workload component. Workload execution is optimized under arrival causality, maximum delay, daily energy balance constraints, and the resulting active and reactive loads are embedded in a distribution power flow model. Compared with the baseline without load shifting, the maximum bus level HC gain on the IEEE 33-bus system reaches 4.46% for MEC DCs and 9.89% for AI DCs, while CDN case shows negligible gain under the assumed cache management windows.

eess.SY↗

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

eess.SY↗

Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment

This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum time-invariant active power demand at a single target bus over a 24-hour peak-day horizon, and evaluates it under four models of increasing fidelity (i.e., the extent to which the model enforces real-world operational security requirements) on the modified IEEE 24-bus system: (i) DC optimal power flow (DC-OPF) without unit commitment (UC), (ii) basic SCUC (security-constrained unit commitment) without reliability constraints, (iii) SCUC with spinning reserve, and (iv) N-SCUC with both reserve and branch-contingency security. Comparing these models quantifies the impact of unit commitment, reserve requirements, and N-1 security on bus-level HC estimates. The N-SCUC yields an average HC of 444 MW; omitting N-1 security raises this to 532 MW, a 19.8% overestimation. The DC-OPF and basic SCUC models further overestimate HC, indicating a trade-off between model complexity and estimation accuracy.

eess.SY↗

Data Center Spatio-Temporal Load Flexibility in Security-Constrained Unit Commitment for Enhanced Grid Efficiency and Reliability

Data center electricity consumption reached 4.4% of U.S. total in 2023 and is projected to grow to 6.7--12% by 2028, imposing increasing stress on transmission networks while representing a largely untapped source of controllable demand-side flexibility. This paper proposes a modular security-constrained unit commitment (SCUC) framework that coordinates flexible data center workloads with system-level scheduling to reduce renewable curtailment, alleviate congestion, and lower operating costs. Three mixed-integer linear programming (MILP) models are formulated: the Data Center Spatial model (DC-S), enabling instantaneous workload redistribution across geographically distributed sites; the Data Center Temporal model (DC-T), permitting each site to shift its deferrable load across time while preserving the daily energy balance; and the Data Center Spatio-Temporal model (DC-ST), jointly activating both mechanisms and spanning the largest feasible operating region. Case studies on a modified IEEE 24-bus reliability test system show that DC-ST eliminates all base-case and post-contingency transmission violations at a flexibility ratio of 40%, and reduces renewable curtailment by up to 84.4% at 30% relative to the inflexible baseline. Sensitivity analysis further reveals that moderate flexibility levels of 20%--30% already capture most of the achievable benefits, supporting practical deployment with limited operational burden on data center operators.

eess.SY↗

Grid Operational Benefit Analysis of Data Center Spatial Flexibility: Congestion Relief, Renewable Energy Curtailment Reduction, and Cost Saving

Data centers are facilities housing computing infrastructure for processing and storing digital information. The rapid expansion of artificial intelligence is driving unprecedented growth in data center capacity, with global electricity demand from data centers projected to double by 2026. This growth creates substantial challenges for power transmission networks, as large concentrated loads can cause congestion and threaten grid reliability. Meanwhile, the intermittent nature of solar and wind generation requires flexible resources to maintain grid reliability and minimize curtailment. This paper assesses whether data center spatial flexibility-the ability to migrate computational workloads geographically-can serve as a grid resource to address these challenges. An optimal power flow model is developed to co-optimize generation dispatch, security reserves, and flexible data center loads. Case studies on a modified IEEE 73-bus system show that inflexible data center placement can lead to severe transmission violations, with line overloads reaching 30.1%. Enabling spatial flexibility mitigates these violations in the studied scenarios and restores system feasibility. This flexibility also reduces solar curtailment by up to 61.0% by strategically reallocating load to solar-rich areas. The results suggest that spatial flexibility offers a viable approach to defer transmission upgrades and enhance renewable utilization.

eess.SY↗