SearcharxivSearch

arXiv subjects

Hongxing Ye

Publications and source records attributed to Hongxing Ye.

7 recordsLinked to original sources

Advanced Capacity Accreditation of Future Energy System Resources with Deep Uncertainties

The electric power sector has seen an increased penetration of renewable energy sources (RESs) that could strain the system reliability due to their inherent uncertainties in availability and controllability. Effective load carrying capability (ELCC) is widely used to quantify the reliability contributions of these RESs. However, existing ELCC methods can over- or under-estimate their contributions and often neglect or simplify other critical factors such as transmission constraints and evolving climate trends, leading to inaccurate capacity credit (CC) allocations and inefficient reliability procurement in capacity markets. To address these limitations, this paper proposes TRACED (TRansmission And Climate Enhanced Delta) -- an advanced capacity accreditation approach that integrates transmission constraints and climate-adjusted system conditions into a Delta ELCC evaluation. Case studies on a modified IEEE-118 bus system with high RES and energy storage penetrations demonstrate that TRACED produces portfolio-consistent CC allocations by capturing resource interactions and avoiding the double-counting of shared reliability benefits inherent in marginal ELCC, which may otherwise lead to under-procurement of reliability resources. Results further demonstrate that transmission congestion and evolving climate trends have mutual impacts on CC allocation, justifying their necessary integration into TRACED.

eess.SY

Benders' decomposition of the unit commitment problem with semidefinite relaxation of AC power flow constraints

In this paper we present a formulation of the unit commitment problem with AC power flow constraints. It is solved by a Benders decomposition in which the unit commitment master problem is formulated as a mixed-integer problem with linearization of the power generation constraints for improved convergence. Semidefinite programming relaxation of the rectangular AC optimal power flow is used in the subproblem, providing somewhat conservative cuts. Numerical case studies, including a 6-bus and the IEEE 118-bus network, are provided to test the effectiveness of our proposal. We show in our numerical experiments that the use of such strategy improves the quality of feasibility and optimality cuts generated by the solution of the convex relaxation of the subproblem, therefore reducing the number of iterations required for algorithm convergence.

math.OC

Robust Coordinated Transmission and Generation Expansion Planning Considering Ramping Requirements and Construction Periods

Two critical issues have arisen in transmission expansion planning with the rapid growth of wind power generation. First, severe power ramping events in daily operation due to the high variability of wind power generation pose great challenges to multi-year planning decision making. Second, the long construction periods of transmission lines may not be able to keep pace with the fast growing uncertainty due to the increasing integration of renewable energy generation. To address such issues, we propose a comprehensive robust planning model considering different resources, namely, transmission lines, generators, and FACTS devices. Various factors are taken into account, including flexibility requirement, construction period, and cost. We construct the hourly net load ramping uncertainty (HLRU) set to characterize the variation of hourly net load including wind power generation, and the annual net load duration curve uncertainty (LDCU) set for the uncertainty of normal annual net load duration curve. This results in a two-stage robust optimization model with two different types of uncertainty sets, which are decoupled into two different sets of subproblems to make the entire solution process tractable. Numerical simulations with real-world data show that the proposed model and solution method are effective to coordinate different flexible resources, rendering robust expansion planning strategies.

math.OC

Robust Integration of High-level Dispatchable Renewables in Power System Operation

The increasing penetration of Renewable Energy Sources (RES) requires more Flexibility Resources (FR), generally thermal units and storages, must be kept in the system to accommodate the uncertainties from RES. The challenge is how the system can survive when the RES level is very high. In this paper, RESs are considered as full-role market participants. They can bid in the day-ahead market, and the powers they deliver to the market are controllable up to their maximum available powers. Therefore, RESs are effectively dispatchable and can function as FR providers. To integrate dispatchable renewables, a two-stage robust Unit Commitment (UC) and dispatch model is established. In the first stage, a base UC and dispatch is determined. In the second stage, all FRs including RESs are used to accommodate the uncertainties, which is a Mixed-Integer Programming (MIP) problem. It is proved that the solution to the max-min problem can be identified directly whether the strong duality holds or not for the inner minimization problem. The solution robustness is guaranteed by including only one extra scenario. Numerical results show the effectiveness of the proposed model and its advantages over the traditional robust UC model with high level RES penetration.

math.OC

Pricing the Ramping Reserve and Capacity Reserve in Real Time Markets

The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. In order to maintain system reliability and security, electricity market operators need to keep certain reserves in the Security-Constrained Economic Dispatch (SCED) problems. A new concept, deliverable generation ramping reserve, is proposed in this paper. The prices of generation ramping reserves and generation capacity reserves are derived in the Affine Adjustable Robust Optimization framework. With the help of these prices, the valuable reserves can be identified among the available reserves. These prices provide crucial information on the values of reserve resources, which are critical for the long-term flexibility investment. The market equilibrium based on these prices is analyzed. Simulations on a 3-bus system and the IEEE 118-bus system are performed to illustrate the concept of ramping reserve price and capacity reserve price. The impacts of the reserve credit on market participants are discussed.

math.OC

Uncertainty Marginal Price, Transmission Reserve, and Day-ahead Market Clearing with Robust Unit Commitment

The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. These uncertainties have to be accommodated by flexible re- sources (i.e. upward and downward generation reserves). In this paper, a novel concept, Uncertainty Marginal Price (UMP), is proposed to price both the uncertainty and reserve. At the same time, the energy is priced at Locational Marginal Price (LMP). A novel market clearing mechanism is proposed to credit the gener- ation and reserve and to charge the load and uncertainty within the Robust Unit Commitment (RUC) in the Day-ahead market. We derive the UMPs and LMPs in the robust optimization framework. UMP helps allocate the cost of generation reserves to uncertainty sources. We prove that the proposed market clearing mechanism leads to partial market equilibrium. We find that transmission reserves must be kept explicitly in addition to generation reserves for uncertainty accommodation. We prove that transmission reserves for ramping delivery may lead to Financial Transmission Right (FTR) underfunding in existing markets. The FTR underfunding can be covered by congestion fund collected from uncertainty payment in the proposed market clearing mechanism. Simulations on a six-bus system and the IEEE 118-bus system are performed to illustrate the new concepts and the market clearing mechanism.

math.OC

Market Clearing for Uncertainty, Generation Reserve, and Transmission Reserve--Part II:Case Study

In Part II of this two-part paper, we analyze the marginal prices derived in Part I of this two-part paper within a robust optimization framework. The load and generation are priced at Locational Marginal Price (LMP) while the uncertainty and generation reserve are priced at Uncertainty Marginal Price(UMP). The Financial Transmission Right (FTR) underfunding is demonstrated when there is transmission reserve. A comparison between traditional reserve price and UMP is presented. We also discuss the incentives for market participants within the new market scheme.

math.OC