Searcharxiv⌕ Search

arXiv subjects

Insoo Park

Publications and source records attributed to Insoo Park.

2 recordsLinked to original sources

Complete Donor-Set Guidance for Frozen Diffusion Docking Models

Metalloprotein docking requires a ligand pose to satisfy both global pocket fit and the identity and geometry of metal-coordinating atoms. General-purpose diffusion docking models do not explicitly condition generation on externally specified complete ligand donor sets, and their predicted poses can exhibit incorrect metal-donor relationships. Metal-aware models address coordination during training and generation; here we ask whether external donor information can correct already-trained general-purpose models without retraining. We propose Complete-Identity Contract Guidance (CICG), which applies a supplied complete donor set through translation, rotation, and torsion updates, and Historical Contract Transfer (HCT), which supplies donor identities from earlier complexes at compatible receptor sites. We compare HCT with trajectory-local controls retaining the historical donor count with or without elemental composition. On 86 assessable HCT-covered queries, HCT-guided CICG increases frozen-confidence-selected joint success from 21.5% to 36.6% on SurfDock and from 25.0% to 34.9% on DiffDock-L. The joint criterion requires correct global ligand placement, complete native donor recovery, coordination geometry, preserved stereochemistry, and absence of fatal receptor clashes. Composition-matched guidance reaches 33.14% and 34.30%, leaving the additional benefit of fixed historical membership unresolved. Our results therefore support donor-set guidance as a conditional correction for frozen docking models, while identifying donor-source reliability and physical-quality preservation as the main barriers to broader use.

physics.chem-ph↗

The low level RT control system of PLS-II storage ring at 400 mA 3.0 GeV

The RF system for the Pohang Light Source (PLS) storage ring was greatly upgraded for PLS-II project of 400mA, 3.0GeV from 200mA, 2.5GeV. Three superconducting(SC) RF cavities with each 300kW maximum klystron amplifier were commissioned with electron beam in way of one by one during the last 3 years for beam current of 400mA to until March 2014. The RF system is designed to provide stable beam through precise RF phase and amplitude requirements to be less than 0.3% in amplitude and 0.3° in phase deviations. This paper describes the RF system configuration, design details and test results.

physics.acc-ph↗