SearcharxivSearch

arXiv subjects

J. C. Mora

Publications and source records attributed to J. C. Mora.

3 recordsLinked to original sources

Identification of unresolved binaries in the VVV b294 tile: A Pro-Am collaboration using the Virtual Observatory

Stellar binaries and multiples are common objects. Their identification and characterization are primarily limited by the angular resolution of current instrumentation, survey depth and dynamic range. Towards the Galactic plane, stellar crowding further complicates these studies. We aim to identify unresolved binaries with good astrometric solutions and M dwarf primaries in the b294 field from the Vista Variables in the Vía Láctea (VVV) survey using publicly available data. We examine the catalogue of M dwarfs within 500 pc in the b294 tile, employing binarity tracers based on statistical parameters from Gaia Data Release 3, multi-band photometry, and information in the literature. We reassess the astrometric and photometric parameters typically used for binary detection, establishing new boundaries and validating existing ones in the dense stellar field examined. We compare these results with those obtained in the solar vicinity. We present 990 unresolved binary candidates and 43 previously known binaries, including five possible triple systems. These represent the 13\% of the catalogue, rising to 14.9\% in well-covered regions. Binary-model SED fitting yields effective temperatures for 98 primary stars, with the properties of their secondary candidates indicating that nearly half may be substellar objects. We select 120 of the most promising binary candidates. Tangential velocities, where calculated, place 95\% of the studied binary candidates within the young disc population (tau <= 1 Ga). We demonstrate that the influence of nearby Gaia detections on the statistical parameters is small, allowing constraints similar to those that are applied in less crowded regions.

astro-ph.SR

Rubin ToO 2024: Envisioning the Vera C. Rubin Observatory LSST Target of Opportunity program

The Legacy Survey of Space and Time (LSST) at Vera C. Rubin Observatory is planned to begin in the Fall of 2025. The LSST survey cadence has been designed via a community-driven process regulated by the Survey Cadence Optimization Committee (SCOC), which recommended up to 3% of the observing time to carry out Target of Opportunity (ToO) observations. Experts from the scientific community, Rubin Observatory personnel, and members of the SCOC were brought together to deliver a recommendation for the implementation of the ToO program during a workshop held in March 2024. Four main science cases were identified: gravitational wave multi-messenger astronomy, high energy neutrinos, Galactic supernovae, and small potentially hazardous asteroids possible impactors. Additional science cases were identified and briefly addressed in the documents, including lensed or poorly localized gamma-ray bursts and twilight discoveries. Trigger prioritization, automated response, and detailed strategies were discussed for each science case. This document represents the outcome of the Rubin ToO 2024 workshop, with additional contributions from members of the Rubin Science Collaborations. The implementation of the selection criteria and strategies presented in this document has been endorsed in the SCOC Phase 3 Recommendations document (PSTN-056). Although the ToO program is still to be finalized, this document serves as a baseline plan for ToO observations with the Rubin Observatory.

astro-ph.IM

The accomplishment of the Engineering Design Activities of IFMIF/EVEDA: The European Japanese project towards a Li(d,xn) fusion relevant neutron source

The International Fusion Materials Irradiation Facility (IFMIF), presently in its Engineering Validation and Engineering Design Activities (EVEDA) phase under the frame of the Broader Approach Agreement between Europe and Japan, accomplished in summer 2013, on schedule, its EDA phase with the release of the engineering design report of the IFMIF plant, which is here described. Many improvements of the design from former phases are implemented, particularly a reduction of beam losses and operational costs thanks to the superconducting accelerator concept, the re-location of the quench tank outside the test cell (TC) with a reduction of tritium inventory and a simplification on its replacement in case of failure, the separation of the irradiation modules from the shielding block gaining irradiation flexibility and enhancement of the remote handling equipment reliability and cost reduction, and the water cooling of the liner and biological shielding of the TC, enhancing the efficiency and economy of the related sub-systems. In addition, the maintenance strategy has been modified to allow a shorter yearly stop of the irradiation operations and a more careful management of the irradiated samples. The design of the IFMIF plant is intimately linked with the EVA phase carried out since the entry into force of IFMIF/EVEDA in June 2007.

physics.acc-ph