SearcharxivSearch

arXiv subjects

J. Dopke

Publications and source records attributed to J. Dopke.

4 recordsLinked to original sources

Identification and mitigation of memory block timing issue in ITk ABCStar during ASIC production

The ABCStar is a mixed-signal front-end readout ASIC for the strips sensor portion of the ATLAS ITk detector being developed as part of the High-Luminosity LHC upgrade. In pre-production testing, a subtle design flaw was uncovered in the ABCStar that was reducing wafer yields in some manufactured lots from the expected 90% to as low as 2%. The root cause was determined to be a timing issue in the logic synthesized to control previously silicon proven memory blocks re-used for this ASIC. The solutions proposed included manufacturing process changes by the wafer foundry, changes to the operating parameters for the ABCStar in the detector, and the possibility that a redesign might be required. The two mitigation efforts were undertaken in parallel, with the process modification route a less desirable solution since already manufactured wafers would need to be scrapped in favour of the new ones. Based on a knowledge of the existing process, and testing done on the worst performing wafers, it was proposed that raising the core operating voltage of the ABCStar from 1.20V to 1.25V could address the timing issue by sufficiently speeding up its transistors. An extensive testing program that included the effects of temperature and radiation expected over the lifetime of the ITk detector was conducted to validate that approach. Those tests and studies proved that even the worst performing wafers would have yields over 80% with the 1.25V core voltage, and neither the modified process nor redesign would be required for ensuring reliable operation of the ITk. Based on testing, a further timing mitigation was implemented to provide an additional margin of reliability by increasing the duty cycle of the clock to the ABCStar. Testing of all ABCStar wafers has been completed and the production of the detector modules using these ASICs is now well underway as a result of the efforts detailed herein.

physics.ins-det

First stave results towards mitigating sensor fracturing with interposers in the ATLAS ITk strips barrel

At the conclusion of Run 3 of the Large Hadron Collider (LHC) at CERN, the accelerator complex will be upgraded to the High-Luminosity LHC (HL-LHC), allowing it to increase the dataset sizes of LHC experiments by about a factor of 20. This significant increase in dataset size will improve the sensitivity and precision of all physics analyses from LHC experiments, but will come with a more challenging data-taking environment. In order to handle this, the ATLAS detector will undergo a substantial upgrade, including an upgrade of its inner tracker to an all-silicon tracker called the Inner Tracker (ITk), made of pixel and strip sub-detectors. During the pre-production phase of the ITk strips, it was discovered that thermally cycling modules loaded onto local support structures led to physical fractures in silicon sensors due to the induced thermal stress. This is understood to be the result of several factors, including the difference in coefficients of thermal expansion between the different module layers, and the close proximity of the module electrical components. Several mitigation strategies were tested to reduce the rate of module fracturing. This paper describes the assembly setup, testing setups, and electrical testing results of ITk strips barrel modules loaded onto local support structures. 69 of 70 modules with an in-built additional kapton layer were found to survive testing down to -70{\deg}C.

physics.ins-det

Test beam measurement of ATLAS ITk Short Strip module at warm and cold operational temperature

This study is focused on an investigation of the performance of the Short Strip module developed by the ATLAS Inner Tracker (ITk) strip collaboration using electron beams of energy 5.4 GeV and 5.8 GeV at the DESY-II Testbeam Facility. The noise at +30 C and -30 C was measured. The ratio of the two measurements is compared with a circuit-model calculation. The measured noise at -30 C is compared with the maximum noise that would correspond to an acceptable signal-to-noise ratio after the expected radiation damage from operation at HL-LHC. The measured charge distributions at +30 C and -30 C are compared with GEANT4 simulations. The detection efficiency and noise-occupancy were measured as a function of threshold at both +30 C and -30 C. The average cluster width was measured as a function of threshold. Scans of detection efficiency versus threshold at different delay settings were used to reconstruct the pulse shape in time. The resulting pulse shape was compared with a circuit model calculation.

hep-ex

Production and Integration of the ATLAS Insertable B-Layer

During the shutdown of the CERN Large Hadron Collider in 2013-2014, an additional pixel layer was installed between the existing Pixel detector of the ATLAS experiment and a new, smaller radius beam pipe. The motivation for this new pixel layer, the Insertable B-Layer (IBL), was to maintain or improve the robustness and performance of the ATLAS tracking system, given the higher instantaneous and integrated luminosities realised following the shutdown. Because of the extreme radiation and collision rate environment, several new radiation-tolerant sensor and electronic technologies were utilised for this layer. This paper reports on the IBL construction and integration prior to its operation in the ATLAS detector.

physics.ins-det