SearcharxivSearch

arXiv subjects

J. Strait

Publications and source records attributed to J. Strait.

3 recordsLinked to original sources

Long baseline neutrino beams at Fermilab

Fermilab has had a very active long baseline neutrino program since initiation of the NuMI project in 1998. Commissioned in 2005, the NuMI beam with 400 kW design power has been in operation for the MINOS neutrino oscillation program since that time. Upgrade of NuMI to 700 kW for NOvA is now well advanced, with implementation of the beam upgrades to be accomplished in 2012-2013. Design development for the next generation LBNE neutrino beam is now a major ongoing effort. We report here salient features and constraints for each of these beams, as well as significant challenges both experienced and expected.

physics.acc-ph

Towards the optimal energy of the proton driver for a neutrino factory and muon collider

Cross section data from the HARP experiment for pion production by protons from a tantalum target have been convoluted with the acceptance of the front-end channel for the proposed neutrino factory or muon collider and integrated over the full phase space measured by HARP, to determine the beam-energy dependence of the muon yield. This permits a determination of the optimal beam energy for the proton driver for these projects. The cross section data are corrected for the beam-energy dependent amplification due to the development of hadronic showers in a thick target. The conclusion is that, for constant beam power, the yield is maximum for a beam energy of about 7 GeV, but it is within 10% of this maximum for 4<Tbeam < 11 GeV, and within 20% of the maximum for Tbeam as low as 2 GeV. This result is insensitive to which of the two HARP groups' results are used, and to which pion generator is used to compute the thick target effects.

physics.acc-ph

Tevatron energy and luminosity upgrades beyond the Main Injector

The Fermilab Tevatron will be the world's highest energy hadron collider until the LHC is commissioned, it has the world's highest energy fixed target beams, and Fermilab will be the leading high energy physics laboratory in the US for the foreseeable future. Following the demise of the SSC, a number of possible upgrades to the Tevatron complex, beyond construction of the Main Injector, are being discussed. Using existing technology, it appears possible to increase the luminosity of the $\bar{p}p$ Collider to at least $10^{33}$cm$^{-2}$sec$^{-1}$ (Tevatron-Star) and to increase the beam energy to 2 TeV (DiTevatron). Fixed target beam of energy about 1.5 TeV could also be delivered. Leaving the existing Tevatron in the tunnel and constructing bypasses around the collider halls would allow simultaneous 800 GeV fixed target and $\sqrt{s}$ = 4 TeV collider operation. These upgrades would give Fermilab an exciting physics program which would be complementary to the LHC, and they would lay the groundwork for the construction of a possible post-LHC ultra-high energy hadron collider. (Presented at the Eighth Meeting of the Division of Particles and Fields Albuquerque, New Mexico, August 2-6, 1994.)

hep-ex