Searcharxiv⌕ Search

arXiv subjects

J. Zalieckas

Publications and source records attributed to J. Zalieckas.

2 recordsLinked to original sources

Gain Stabilization of SiPMs with an Adaptive Power Supply

The gain of silicon photomultipliers (SiPMs) increases with bias voltage and decreases with temperature. To operate SiPMs at stable gain, the bias voltage can be readjusted to compensate for temperature changes. We have tested this concept with 30 SiPMs from three manufacturers (Hamamatsu, KETEK and CPTA) operating in a climate chamber at CERN by varying temperatures between $1^\circ \rm C$ and $48^\circ \rm C$. We built an adaptive power supply that uses a linear dependence of the bias voltage on temperature. We stabilized four SiPMs simultaneously with only one compensation parameter for the readjustment of the bias voltage of four SiPMs. For all tested Hamamatsu and CPTA SiPMs we achieved our goal of limiting gain changes to less than $\pm 0.5\%$ in the $20-30^\circ C$ temperature range.

physics.ins-det↗

SuperB Technical Design Report

In this Technical Design Report (TDR) we describe the SuperB detector that was to be installed on the SuperB e+e- high luminosity collider. The SuperB asymmetric collider, which was to be constructed on the Tor Vergata campus near the INFN Frascati National Laboratory, was designed to operate both at the Upsilon(4S) center-of-mass energy with a luminosity of 10^{36} cm^{-2}s^{-1} and at the tau/charm production threshold with a luminosity of 10^{35} cm^{-2}s^{-1}. This high luminosity, producing a data sample about a factor 100 larger than present B Factories, would allow investigation of new physics effects in rare decays, CP Violation and Lepton Flavour Violation. This document details the detector design presented in the Conceptual Design Report (CDR) in 2007. The R&D and engineering studies performed to arrive at the full detector design are described, and an updated cost estimate is presented. A combination of a more realistic cost estimates and the unavailability of funds due of the global economic climate led to a formal cancelation of the project on Nov 27, 2012.

physics.ins-det↗