A Scalable Nyquist Stability Criterion with Application to Power System Small-Signal Stability

A decentralized stability criterion is derived for a power system with heterogeneous subsystems. A condition for frequency stability and stability of interarea modes is derived using the generalized Nyquist criterion. The resulting scalable Nyquist stability criterion requires only locally available information and gives a priori stability guarantees for connecting new subsystems to an arbitrarily large network. The method can be applied to a general set of agents. For instance, agents with time-delays, nonminimum phase actuators or even unstable dynamics. The scalable Nyquist criterion makes no distinction between nodes with or without synchronous inertia, making it easy to include converter-interfaced renewable energy in the analysis. The method is validated on a detailed nonlinear power system model with frequency droop provided by hydro governors assisted by wind power.

eess.SY↗

Variable-Speed Wind Turbine Control Designed for Coordinated Fast Frequency Reserves

Modern power systems present low levels of inertia due to the growing shares of converter-interfaced generation. Consequently, renewable energy sources are increasingly requested to provide frequency support. In addition, due to the inertia loss, the requirements regarding frequency containment reserves (FCR) are becoming tough to meet with traditional units such as hydro, whose non-minimum phase (NMP) characteristic reduces the closed-loop stability margins. The shortcomings of traditional synchronous generation motivates new protocols for fast frequency reserves (FFR). In this work, we design a wind turbine (WT) model useful for FFR. It is shown that the dynamical shortcomings of the WT, in providing steady-power or slow FCR support, are suitably described by a first-order transfer function with a slow NMP zero. The WT model is tested in a 5-machine representation of the Nordic synchronous grid. It is shown that the NMP model is useful for designing a controller that coordinates FFR from wind with slow FCR from hydro turbines. By simulating the disconnection of a 1400 MW importing dc link in a detailed nonlinear model, it is shown that the wind--hydro combination not only satisfies the latest regulations, but also presents a smooth response avoiding overshoot and secondary frequency dips during frequency recovery.

eess.SY↗

Influence of Sensor Feedback Limitations on Power Oscillation Damping and Transient Stability

Fundamental sensor feedback limitations for improving rotor angle stability using local frequency or phase angle measurement are derived. Using a two-machine power system model, it is shown that improved damping of inter-area oscillations must come at the cost of reduced transient stability margins, regardless of the control design method. The control limitations stem from that the excitation of an inter-area mode by external disturbances cannot be estimated with certainty using local frequency information. The results are validated on a modified Kundur four-machine two-area test system where the active power is modulated on an embedded high-voltage dc link. Damping control using local phase angle measurements, unavoidably leads to an increased rotor angle deviation following certain load disturbances. For a highly stressed system, it is shown that this may lead to transient instability. The limitations derived in the paper may motivate the need for wide-area measurements in power oscillation damping control.

eess.SY↗

Dynamic Virtual Power Plant Design for Fast Frequency Reserves: Coordinating Hydro and Wind

To ensure frequency stability in future low-inertia power grids, fast ancillary services such as fast frequency reserves (FFR) have been proposed. In this work, the coordination of conventional (slow) frequency containment reserves (FCR) with FFR is treated as a decentralized model matching problem. The design results in a dynamic virtual power plant (DVPP) whose aggregated output fulfills the system operator (SO) requirements in all time scales, while accounting for the capacity and bandwidth limitation of participating devices. This is illustrated in a 5-machine representation of the Nordic synchronous grid. In the Nordic grid, stability issues and bandwidth limitations associated with non-minimum phase zeros of hydropower is a well-known problem. By simulating the disconnection of a 1400 MW importing dc link, it is shown that the proposed DVPP design allows for coordinating fast FFR from wind, with slow FCR from hydro, while respecting dynamic limitations of all participating devices. The SO requirements are fulfilled in a realistic low-inertia scenario without the need to install battery storage or to waste wind energy by curtailing the wind turbines.

eess.SY↗

Control Limitations due to Zero Dynamics in a Single-Machine Infinite Bus Network

In this work, fundamental control limitations for rotor angle stability are considered. Limitations are identified by characterizing open-loop transfer function zeros for input-output combinations of certain power system configurations. Of particular interest are non-minimum phase (NMP) zeros that limit the achievable performance of the closed-loop system. By studying a single-machine infinite bus power system model, analytic conditions for the presence of NMP zeros are derived. They are shown to be closely linked to the destabilizing effect of automatic voltage regulators (AVRs). Depending on the control loop, it is found that NMP zeros may persist in the system even if the closed-loop system is stabilized through feedback control. A simulation study shows that NMP zeros introduced by AVR limit the achievable performance and stabilization using feedback control.