SearcharxivSearch

arXiv subjects

Jongha Woo

Publications and source records attributed to Jongha Woo.

3 recordsLinked to original sources

Design and Implementation of Scalable Communication Interfaces for Reliable and Stable Real-time Co-Simulation of Power Systems

Co-simulation offers an integrated approach for modeling the large-scale integration of inverter-based resources (IBRs) into transmission and distribution grids. This paper presents a scalable communication interface design and implementation to enable reliable and stable real-time co-simulation of power systems with high IBR penetration. The communication interface is categorized into two types: local and remote. In local scenarios, where subsystems are connected within a single local area network (LAN), low-latency communication facilitates the seamless integration of electromagnetic transient (EMT) and phasor-domain models, enabling efficient interactions with power and energy management algorithms. For remote scenarios, data exchange is achieved via internet-based file sharing or VPN-enabled communication. The performance of both methods is evaluated using OPAL-RT as a real-time simulator, demonstrating scalability, effectiveness, and challenges specific to real-time co-simulation applications. To mitigate instability arising from data resolution mismatches in time-sensitive co-simulations, a real-time data extrapolation method is proposed. This approach significantly enhances stability and reliability, ensuring more accurate simulation outcomes. The implementation code is available on GitHub, providing researchers the tools to replicate and expand upon this work.

eess.SY

Invisible Manipulation Deep Reinforcement Learning Enhanced Stealthy Attacks on Battery Energy Management Systems

This paper introduces "invisible manipulation," an innovative cyber-attack mechanism achieved through strategically timed stealthy false data injection attacks (SFDIAs). By stealthily manipulating measurements of a critical asset prior to the target time period, the attacker can subtly guide the engineering system toward a predetermined operational state without detection. Using the battery energy management system (BEMS) as a case study, we employ deep reinforcement learning (DRL) to generate synthetic measurements, such as battery voltage and current, that align closely with actual measurements. These synthetic measurements, falling within the acceptable error margin of residual-based bad data detection algorithm provided by state estimation, can evade detection and mislead Extended Kalman-filter-based State of Charge estimation. Subsequently, considering the deceptive data as valid inputs, the BEMS will operate the BESS towards the attacker desired operational states when the targeted time period come. The use of the DRL-based scheme allows us to covert an online optimization problem into an offline training process, thereby alleviating the computational burden for real-time implementation. Comprehensive testing on a high-fidelity microgrid real-time simulation testbed validates the effectiveness and adaptability of the proposed methods in achieving different attack objectives.

eess.SY

Assessment of Transmission-level Fault Impacts on 3-phase and 1-phase Distribution IBR Operation

The widespread deployment of inverter-based resources (IBRs) renders distribution systems susceptible to transmission-level faults. This paper presents a comprehensive analysis of the impact of transmission-level faults on 3-phase and 1-phase distribution IBR operation. To evaluate distributed IBR tripping across various phases and locations on a distribution feeder, we conduct simulations of both symmetrical and unsymmetrical transmission faults at progressively greater electrical distances on a real-time transmission and distribution (T&D) co-simulation platform. The IBR power-to-load ratios (PLRs) at 50%, 100%, and 300% are considered to emulate low, medium, and high IBR conditions. Our results indicate that, while 1-phase and 2-phase faults typically trigger fewer IBR trips when compared to 3-phase faults, a significant power imbalance arises from the tripping of 1-phase IBRs on the affected phases. The imbalance can result in significant power quality problems and unintended equipment tripping. It may be necessary to design fault-ride-through mechanisms specifically tailored to 1-phase IBRs to help mitigate the power imbalances caused by unbalanced faults.

eess.SY